My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#2286 Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4355 Bayside Road - 06-117-23-13-0005 - New PID
>
4355 Bayside Rd - PID: 06-117-23-12-0007 - Old PID
>
Land Use
>
97-2286, SUBD
>
#2286 Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 11:26:50 AM
Creation date
10/23/2025 11:25:18 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:MINUTES OF THE ORONO PLANNING COi'AMISSION <br />:MEETING HELD ON SEPTEMBER 15, 1997 <br />indicated that the attorneys for the city and applicant have agreed that the subdivision is a <br />Class I, metes and bounds division, as the property is not platted and will not require park <br />dedication. <br />Gaffron recommended the property line be moved for Lot A as the northern portion of <br />Bayside Road would be less than 5 acres. There is a small wetland located to the east, <br />north of Bayside Road, which will have a Conservation and Flowage easement as well as <br />that portion on the south side abutting Lake Minnetonka via the channel. A concern was <br />voiced that depending on where the 929.4 lake elevation is located, the property could be <br />considered a lakeshore lot. If so, parcels A and B would not meet the 500' width <br />requirement measured at the shoreline and at the 75' setback. Due to this, the Staff and <br />City Attorney have concluded that this split is not exempt but must be at least considered <br />a Class I Subdivision. The 2 acre minimum is met by the parcels and Gaffron noted that <br />the property could be further subdivided in the future. <br />Gaffron requested_ the applicant show the 929.4 contour on the survey. Parcel A includes <br />a barn and out buildings that will have to be removed. Gaffron recommended the <br />removals occur within six months of the subdivision approval. Septic system testing has <br />taken place. The house meets all setback requirements. <br />Gaffron reviewed the issues for discussion as noted in the packet. <br />The applicant had no further comments to add at this time. <br />Lindquist asked \Vhite if he was willing to move the lot line to accommodate parcel A <br />having at least 5 acres of dry buildable. White said he would as it was his intent to have <br />2
The URL can be used to link to this page
Your browser does not support the video tag.