My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-1984 Council Packet
Orono
>
City Council
>
1984
>
03-12-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 9:33:58 AM
Creation date
10/20/2025 9:29:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.•. <br />(1) Wages paid for labor Jn the direct employ of Con- <br />tractor in the performance of the changed work in the <br />field or in the fabrication shop under applicable col- <br />lective bargaining agreements or under a salary or wage <br />schedule agreed upon by Contractor and Owner, plus a <br />payroll markup of 20 percent to cover all overheLd items ' <br />applicable to payroll, such as insurance, taxes, <br />F.I.C.A., workmen's compensation, unemployment taxes, <br />and union benefits. <br />(2) Cost of all materials, supplies and equipment in- �+ <br />corporated in the changed work. <br />(3) Cost, including maintenance of all materials, sup- <br />plies, equipment, tempor.ery facilities and hand tools <br />owned by workmen, which are consumed in the performance <br />of the changed work, and cost less salvage value on such <br />items used but not consumed which remain the property of ^ <br />the Contractor. <br />(4) Third party rental charges of all necessary ma- «. <br />chinery and equipment, exclusive of hand tools, used in <br />performing the changed work, including installation, <br />minor repairs and replacements, dismantling, removal, VW <br />transportation and delivery costs thereof at rental <br />charges consistent with those prevailing in the area. *� <br />(5) Cost of additional premiums for all bonds and in- <br />surance which the Contractor is required by the owner or ... <br />contract documents to purchase and maintain and which is <br />incurred as a result of performing the changed w-rk. <br />(b) Sales, use or similar taxes, related to the changed <br />work and for which the Contractor is liable, imposed by <br />any governmental authority. <br />V4 <br />(7) Permit fees, royalties, damages for infri.gment of <br />patents and costs of defending suits therefore, and de- <br />posits lost for causes other than the Contractor's neg- <br />ligence. <br />(8) Losses and expenses, <br />not compensated <br />by insurance <br />64 <br />or otherwise sustained by <br />the Contractor <br />in connection <br />fto <br />with the changed work provided <br />they have <br />resulted from <br />causes other than the sole <br />or joint fault <br />or neglect of <br />the Contractor, any subcontractor, <br />anyone <br />directly ar <br />indirectly employed by any <br />of them, or for <br />whose acts <br />any of them may be liable. <br />Such losses shall <br />include <br />settlements made with the <br />written consent <br />and approval <br />v <br />J <br />-40- <br />3595a <br />4/81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.