My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-1984 Council Packet
Orono
>
City Council
>
1984
>
03-12-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 9:33:58 AM
Creation date
10/20/2025 9:29:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
of the Owner. No such losses and expenses shall he in- <br />cluded in the cost of the changed work for the purpose <br />of determining the Contractor's fees thereon. If, how- <br />ever, such loss requires reconstruction and the Contrac- <br />tor is placed in charge thereof, he shall be paid for <br />his services an additional fee computed in proportion to <br />the sum stated above for the original changed work. <br />(9) Cost of "drayage," exclusive of any drayage between <br />shop and jobsite, only when Contractor must hire an in- <br />dependent trucking firm and driver to perform special <br />drayage services in performance of the changed work for <br />which Contractor's skills, manpower and vehicles are in- <br />adequate. "Drayage" does not include transportation <br />performed or which could have been performed by Contrac- <br />tor's drivers or vehicles but for their use on another <br />project. <br />(10) Costs incurred due to an emergency arising out of <br />the changed work affecting the safety of persons and <br />property. <br />(11) Other costs incurred in the performance of the <br />changed work if and to the extent approved in advance in <br />writing by the Owner. <br />(12) Cost of subcontractors in performing he Contrac- <br />tor's work as changed under this paragrap'. 2.3.3, com- <br />puted in accordance with clauses 12.3.1, .2, or .3. <br />b. The cost of the changed work shall exclude: <br />(1) Salaries or other —impensation for Contractor's <br />officers, executi,,e, b,.ieral managers, project managers, <br />estimators, engineers, timekeepers, surveyors, mechan- <br />ica, warehousemen, auditors, accountants, purchasing aad <br />contracting agents, draftsmen (except sheetmetal drafts- <br />men). stenographers, receptionists, and other staff em- <br />ployees, whether or not employed at Contractor's princi- <br />pal office, branch office or field office at the job <br />site. <br />(2) Expenses of Contractor's principal office, branch <br />office or job site field office, including without lim- <br />itation the expense for pick-up trucks, office trailers, <br />storage trailers, rental of office or storage space, <br />v telephone, heat, lights, etc. <br />v <br />- 41 - <br />t .t 3595a <br />to 4/81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.