My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-1984 Council Packet
Orono
>
City Council
>
1984
>
03-12-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 9:33:58 AM
Creation date
10/20/2025 9:29:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.7 UNUEUAL CONDITIONS <br />Contractor shall promptly notify Owner and Engineer in writing of any <br />subsurface or latent physical conditions at the site or in an existing <br />structure differing materially from those indicated or referred to in the <br />Contract Documents. Engineer will promptly review those conditions and advise <br />Owner in writing if further investigation or tests are necessary. Promptly <br />thereafter, Owner shall obtain the necessary additional investigations and <br />tests and furnish copies to Engineer and Contractor. If Engineer finds that <br />the results of such investigations or tests indicate that there are subsurface <br />or latent physical conditions which differ materially from those intended in <br />the Contract Documents, and which could not reasonably have been anticipated <br />by Contractor, a Change Oider shall be issued incornorating the necessary <br />revisions. <br />SECTION 7 <br />MATERIALS. EOUIPMENT AND WORKMANSHIP <br />7.1 MATERIALS AND EQUIPMENT FURNISHED BY CONTRACTOR <br />7.1.1 Contractor shall furnish all materials, equipment, labor, <br />transportation, construction equipment and machinery, tools, appliances, <br />fuel, power, light, heat, telephone, water and sanitary facilities and all <br />other facilities and incidentals necessary for the execution, testing, <br />initial operation and completion of the Work. <br />7.1.2 All materials used in the Work shall be of good quality, new unless <br />.�s otherwise provided for in the Contract Documents, shall meet the <br />requirements of the Specifications, and shall not be incorporated into the <br />Work until reviewed by the Engineer, If required by Engineer, Contractor <br />►++ shall furnish satisfactory evidence (including reports of required tests) <br />as to the kind and quality of materials and equipment. <br />r� <br />7.1.3 All materials and equipment shall be applied, installed, connected, <br />erected, used, cleaned and conditioned in accordance with the instructions <br />�., of the applicable manufacturer, fabricator, supplier or distributor, <br />except as otherwise provided in the Contract Documents. <br />7.2 MATERIALS FURNISHED BY OWNER <br />7.2.1 Materials specifically indicated shall be furnished by the Owner. <br />Before incorporating any of the materials into the Work, the contractor <br />shall inspect the materials so furnished by the Owner. If the Contractor <br />discovers any patent defects in material furnished by the Owner, he shall <br />notify the Engineer. <br />7.2.2 Unless otherwise noted or specifically stated, materials furnished <br />r by the Owner are considered to be f.o.b. the nearest railroad station or <br />truck line. The (.onfractor shall transport the materials to the job site, <br />77 <br />19 _. <br />1t <br />3526a <br />ke 4181 <br />
The URL can be used to link to this page
Your browser does not support the video tag.