Laserfiche WebLink
5.1.3 Engineer will have authority to disapprove or reject Work which is <br />defective, and will also have authority to require special inspection or <br />testing of the Work as provided in Paragraph 7.9, whether or not the Work <br />is fabricated, installed or completed. The Engineer shall not have charge <br />of or control over the Work and shall have no authority to stop the Work. <br />5.1.4 If Owner and Engineer agree, Engineer will furnish a Resident <br />Project Representative to assist Engineer in observing the performance of <br />the Work. The duties, responsibilities and limitr•_ions of authority of <br />any such Resident Project Representative and assistants will be as <br />provided in these Conditions for i.he Engineer. <br />5.1.5 Neither Engineer's authority to act under this Section 5 or <br />elsewhere in the Contract Documents nor any decision made by Engineer in <br />good faith either to exercise or not exercise such authority shall give <br />rise to any duty or responsibility of Engineer to Contractor, any <br />Subcontractor, any manufacturer, fabricator, supplier or distributor, or <br />any of their agents or employees or any other person performing any of the <br />Work. <br />5.1.6 Whenever in the Contract Documents the terms "as ordered", "as <br />directed", "as required", "as allowed", or terms of like effect or import <br />are used, or the adjectives "reasonable", "skii.table", "acceptable", <br />"proper", or "satisfact,)ry", or adjectives of like effect or import are <br />used to describe requirements, direction, review or judgment of Engineer <br />as to the Work, it i,s intended Char such requirements, direction, review <br />or judgment will be solely to evaluate the Work for compliance with the <br />Contract Documents (unless there is a specific statement indicating <br />otherwise). The ,use of any such term or adjective never indicates that <br />Engineer shall 1-.ave authority to supervise or direct performance of the <br />Work or authority to undertake responsibility contrary to the provisions <br />of Paragraphs 5.1.7 or 5.1.8. <br />5.1.7 Engineer will not be responsible for Contractor's means, methods, <br />techniques, sequences or procedures of construction, or the safety <br />precauti,,ns and programs incident thereto, and Engineer will not be <br />responsible for contractor's failure to perform the Work in accordance <br />with t'ie Contract Documents. <br />Enginee, will not be responsible for the acts or omissions of <br />Contractor or of any Subcontractors, or of the agents or employees of any <br />Cortractor or Subcontractor, or of any other persons at the site of <br />otherwise performing any of the Work. <br />k .F <br />5.2 ASSIGNMENT OF CONTRACT <br />WIN The Contractor shall neither sublet, sell, transfer, assign or otherwise dis- <br />poAe of the Contract or any portion thereof, or of his right, title or inter- <br />e,,t therein, or his obligations thereunder, nor, if this Contractor is a cor- <br />porate entity, sublet, sell, transfer or assign a majority of the outstanding <br />VO (hares of stock in the corporation, without prior written consent of the <br />w <br />- 13 - <br />( 3526a <br />r 4/81 <br />