My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-1984 Council Packet
Orono
>
City Council
>
1984
>
03-12-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 9:33:58 AM
Creation date
10/20/2025 9:29:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
number. This procedure is not to be construed as eliminating from <br />competition. other products of equal or better quality by other <br />manufacturers where fully suitable in design unless otherwise spe:ifically <br />stated in the Specifications or Special Provisions. <br />4.12.2 The Contractor shall furnisl, the complete list of proposed desired <br />substitutions prior to executing the Agreement, together with such <br />engineering and Product Data as the Engineer may require. <br />4.12.3 Thr. Contractor shall abide by the Engineer's recommendation when <br />proposed substitute materials o- items of equipment are not: recommended <br />for installation and shall furnish the specified material or item of <br />equipment in such case. All proposals for substitutions shall be <br />;,-,bmitted in writing by the General Contractor and not by individual <br />or material suppliers. The Engineer will review proposed <br />Lutions and make his recommendation in writing within a reasonable <br />4.13 FURNISHING OF r RODUCT DATA <br />4.13.1 The Contractor shall furnish one copy of complete Product Data for <br />every manufacturered item of e, ipment and all component: to be used in <br />the Work, including specific performance data, material description, <br />rating, capacity, working pressure, material gag_^ or thicknec,:, branG <br />name, catalog number and general type. <br />4.13.2 This data shall be compiled by the Contr--tor and reviewed by the <br />Engineer before any of the equipment is ordered. <br />4.13.3 'il data shall be indexed according to specification section and <br />paragral . for easy ref.- rence. <br />4.13.4 After review, 0iis data shall become a part of t`ie U-intract, and <br />may nc` be deviated from -xcept upon written approval of the Engineer <br />4.13.5 Product Data ' :,r equipment reviewed by the Engineer does ,,..t in <br />any cane ^rpr•f- the Contract Documents. The rev: s! by the Engineer <br />shall no. the Contractor from responsibili.y for deviations from <br />Drawings or Specifications unless he has in writing called the Engineer's <br />attention to such deviations at the time of furnish;--z said data. Nox <br />Baal; such review relieve the Contract-)r from responsibility for errors of <br />any sort the items furr.i.shed. T, Contractor shall 'heck tae Work <br />described b,, .ne Product Data with th „entrant Documents for deviations <br />and errors. <br />4.13.6 It shall be the responsibility of the Contr-^tor to insure tha-- <br />,� items to be furnished fit the space a ble. He LA.all make necess- <br />field measurements to at--ertain space i.rements, including those for <br />c-nnections, and shall order such sizes and shapes or that '.he <br />f_nal in3tall7t.ion shall suit the true intent anJ meaning o a Drawings <br />and Spec. ificat.ans. <br />iw <br />35?6a <br />4j S1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.