My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-1984 Council Packet
Orono
>
City Council
>
1984
>
03-12-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 9:33:58 AM
Creation date
10/20/2025 9:29:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br />4.11.3 Shop Drawings shall be submitted according to the following <br />schedule: <br />(a) Three copies shall be submitted with reasonable r,romptness and <br />in such sequence as to prevent delay cf the Work. <br />(b) The Engineer shall, within fourteen (14) days cf tipsubmittal <br />�1 <br />of any Shop Drawings, return one copy to the Contractor mz;ieo� with <br />corrections and changes. <br />i <br />(c) The Contractor shall then promptly correct the Shop Drawings to <br />conform to the corrections and changes requested by the Engineer. <br />04 <br />(d) Following completion of such corrections and changes, the <br />Contractor shall prougtly furnish the Engineer two copies of the Shop <br />Drawings conformin^ to the require.: corrections and changes. <br />4.11.4 Engineer will review with reasonable promptness Shop Drawings and <br />samples, but Engineer's review shall be only for conformance with the <br />design concept of the Project and for compliance with the informatics <br />n <br />given in the Cortract Documents and shall not- extend to means, methods, <br />sequences, techniques or procedures of construction or to safety <br />precautions or programs incident thereto. The review of a separate item <br />as such will not indicate review of the assembly in which the item <br />functions. Contractor shall make any corrections required by Engineer and <br />shall return the required number of corrected copies of Shop Drawings and <br />resubmit new samples for review. Contractor shall d .-ect specific <br />attention in writing to revisions other than the corrections called .,r by <br />' <br />Engin,�er on previous aubmittals. Contractor's stamp of approval on any <br />Shop Drawing or sample shall constitute a representation to Owner and <br />Engineer that Contractor has either determ4---d and verified all <br />quantities, dimensions, field construction criteria, materials, catalog <br />numbers, and similar data or assumes full responsibility for doing so, and <br />that Contractor has reviewed or coordinated each Shop Drawing or simple <br />with the requirements of the Work and the Contract Dor-rents. <br />4.11.5 Where a Shop Drawing or sample is required by the Specifications, <br />no related -k shall be commenced until the submittal has been reviewed <br />�.- <br />and F- prove.. Engineer. <br />411.6 Engineer's reviee, or <br />approval of Shop <br />L rings or sam.nles shall <br />not <br />04 <br />relieve Contractor from <br />responsibility for any deviations from <br />the <br />%A <br />Contract Documents unless <br />Contra: - has <br />in writ4.ng called Engineer's <br />attention to such deviation <br />at the time or <br />submission and Engineer <br />has <br />given written concurrence <br />and approval to <br />the specific deviation, <br />nor <br />-kid <br />shall any concurrence or <br />approval by Engineer re,'»ve Contractor <br />from <br />responsibility for errors or omissions in the <br />Shop Draw:ngm. <br />o± <br />4.12 QUALITY OF EQUIPMENT AND MATERIALS w <br />4.12.1 -n order to establish standards of quality, the Engineer, in the , <br />Specifications, has referred to certain p,oduct,- 5y name and catalog <br />s� <br />- 10 - <br />352 6a <br />4/81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.