My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-1984 Council Packet
Orono
>
City Council
>
1984
>
03-12-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 9:33:58 AM
Creation date
10/20/2025 9:29:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
quest at the completion of the Work. Submission or distribution to meet offi- <br />cial regulatory requirements or for other purposes in connection with t',e Pro- <br />ject is not to be construed as publication in derogati)n of the EnL.neer's <br />common law copyright or other reserved rights. <br />4.8 DIMENSIONS <br />Figured dimensions on the plans will be used in p-eference to scaling the <br />Drawings. .,here the work of the Contractor is affected by finish dimensions, <br />these shall be determined by the Contractor at the site, and he shall assume <br />the responsibility therefor. <br />4.9 SAMPLES <br />All samples called for in the Specifications or required by the Engineer shall <br />be furnished by the Contractor and shall be submitted to the Engineer for his <br />review. Samples shall be furnished so as not to delay the Project. The <br />Contractor shall furnish such samples of material as may be required for <br />examination and testing. All materials and workmanship shall be in accordance <br />with approved samples. All samples of materials for tests shall be taker <br />according to methods provided for in the Specifications. <br />4.10 PRODUCT DATA <br />Product Data are illustrations, standard schedules, performance charts, <br />instructions, brochures, diagrams and other information furnished by the <br />Contractor to illustrate a material, product or system for some portion of the <br />Work. <br />4.11 SHOP DRAWINGS <br />4.11.1 The Contractor shall provide Shop Drawings, settings, schedult.- <br />and such other drawings as may be necessary for the prosecution of the <br />Work in the shop and in the field as required by the Drawing, <br />pecifications or Engineer's instructions. Dpviations + -m the Drawing: <br />and Specifications shall be called to the attention of t Engine;:e at the <br />time of the first submission of Shop Drawings and other drawings for <br />approval. The Engineer's review of ar drawings shall ncl release the <br />Contractor from responsibility for such ztior.s. <br />4.11.2 Shop Drawings shall be promptly submitted by the Contractor after <br />he has reviewed, checked and approved the data to determi%:. that they <br />in harmony with the requiremer f the Project dnd with the provisions of <br />the Contract Documents and af•. c ;Aas verified all field measurements <br />and construction criteria, mate. —is, catalog numbers and similar data. <br />By submitting the Shop Drawings, the Contract<r certifies that the work <br />represented by the Shop Drawings has been coordinated with th,� Contract <br />Documents and all relevant field conditions. <br />M <br />- 9 - <br />3526a <br />r 4/81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.