My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-1984 Council Packet
Orono
>
City Council
>
1984
>
03-12-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 9:33:58 AM
Creation date
10/20/2025 9:29:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL PROVISIONS <br />1. PROJECT DESCRIPTION: The project consists of the total construction of a <br />handicap access ramp at the Iakeview Golf Course in Olino. <br />The construction includes concrete footings and ramp, concrete block walls and <br />wood railing reconstruction. <br />2. OWNER: The City of Orono is designated as the Owner. The work as <br />outlined herein is on private property presently leased by the City. <br />All work shall oe coordinate•i with the City Engineer and the public works <br />director. <br />No work that is not specifically shown on the plan or specified shall be done <br />unless a written order is given to the Contractor by the Citv aphorizing such <br />extra work on changes in the plans. <br />3. AREA INSPECTION AND SOIL CONDITIONS: All Contractors are advised to <br />inspect the site to verify soil conditions and determine the conditions that <br />will be expected prior to submitting a bid. <br />4. TRAFFIC: The Contractor shall provide all barriers, signs and flashers <br />necessary for the safe operation of the project. <br />5. CLEANUP S RESTORATION: The Contractor shall be responsible for all area <br />cleanup upon completion of the project All construction debris shall be re- <br />moved. Because of the nature of the construction site, all construction <br />debris shall be kept to a minimum during construction. <br />6. PROTECTION Or ADJACENT PROPERTY: The Contractor shall be totally respon- <br />sible for any damage caused by his operations or those of any of his sub- <br />contractors. <br />7. SAFETY REQUIREMENTS: V'-- Contractor is responsible for strict adherence <br />or compliance with all local, State and Federal safety requirements. <br />8. CONSTRUCTION INSPECTION: All work on the project is to be inspected by <br />the Consulting Engineers, Bonestroo, Rosene, Anderlik b Associates, Inc., 2335 <br />West Highway 36, St. Paul, Minnesota 5511.3. All correspondence, shop draw- <br />ings, etc. on the project shall be directed to this address. Project Engineer <br />for this project shall. be Mr. Glenn Cook, unless otherwise notified. Phone <br />No. is 636-4600, Area Code 612. All shop drawings shall be submitted to this <br />address. <br />9. _PAYMENT: Payments for construction of the project will be made on a <br />monthly basis to the Contractor based on his monthly estimates which shall be <br />submitted to the Consulting Engineers, Bonestroo, Rosene, Anderlik b Associ- <br />ates, Inc., for review and recommendation to the City Council for. payment. <br />Payment will be by cash or check. <br />SP-1 <br />1r 0-9693b <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.