My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4852
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 4800 - 4899 (May 13, 2002 - November 25, 2002)
>
Resolution 4852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 1:58:05 PM
Creation date
11/13/2015 1:58:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7 � <br /> O J■� <br /> � �v <br /> O O <br /> � '� . r CITY of ORONO <br /> � <br /> ,� .;. � � <br /> ti <br /> �'.� p'�' RESOLUTION OF THE CITY COUNCIL <br /> ��kESII�g'� NO. � � o� � <br /> within the Commons Lot and within the Commercial Outlots. <br /> Such trail may be located within the Highway 12 right-of-way if <br /> a 20' separation is maintained from the traveled roadway of <br /> Highway 12, and if MnDOT approval is obtained. Portions of the <br /> trail may be located within the right of way of Kelley Parkway <br /> north of the stormwater pond. Said trail shall be curvilinear along <br /> ' Willow Drive as shown in the Concept Plan drawings. The trail <br /> shall provide a continuous connection along Highway 12 from the <br /> east boundary of the property to the west boundary; connection <br /> across the stormwater pond area may be along Highway 12 or may <br /> . jog up to and back down from Kelley Parkway along the <br /> stormwater pond perimeter. If portions of the trail are located <br /> adjacent to Kelley Parkway, that portion should be designed to <br /> function as both a trail and sidewalk at a total width of 8'. The <br /> . � construction of the portions of said public trail within the <br /> . Commercial Outlots adjacent to Highway 12 may be deferred until <br /> � a determination is made whether the Highway 12 boulevard area <br /> will be converted from a rural section to an urban section and/or <br /> until the commercial lots are developed. The portion of trail along <br /> Willow Drive in the commercial outlot shall be constructed during <br /> the initial phases of residential development, to ensure that the area <br /> designated for trail use is not commercially developed. The City <br /> shall be responsible for maintenance of the public trails upon their <br /> completion and acceptance. Public easements including a suitable <br /> shoulder width shall be granted over the public trails. <br /> 14) Sidewalks along both sides of Kelley Parkway shall be provided <br /> , by the developer as follows: <br /> North and South Sides of Kellev Parkway: 5' concrete sidewalk <br /> separated from back of curb by 8' to accommodate deciduous <br /> trees and landscaping in boulevard. <br /> All trails and sidewalks, whether public or private, shall be � <br /> installed concurrently with the development phases and prior to <br /> occupancy of residential units, to avoid neighborhood resistance <br /> , to trail development at a later date. <br /> � <br /> Pa�e 14 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.