Laserfiche WebLink
Zoning Application #2114 <br />March 11, 1996 <br />Page 2 <br />J-1-2 Profiles of Soil Exploration and Correction <br />K - Cross Section of Wall <br />L - Resolution No. 3651 <br />M - Photos of Bank 1987/1996 <br />Brief Review of Application <br />In the summer of 1987, many properties within the City sustained severe erosion resulting from <br />back-to-back 100 Year Storms. The City adopted an emergency ordinance that would allow <br />immediate repair of eroding banks. The City did not require conditional use permits but encouraged <br />property owners to proceed with necessary repairs as long as the City staff was to issue land <br />alteration permits covering improvement. The 24' of wall that exists within this property and the <br />properties to the north were improvements conducted during the effective period of the emergency <br />ordinance of 1987. <br />Review the photos, Exhibit M, there is an existing timber retaining wall within a portion of the 90 <br />lineal feet of the bank that is in a state of deterioration. There are visual signs of erosion of the bank. <br />It is the applicant's plan to install the same treated timber walls constructed to the north. The <br />Engineer strongly recommends installation of a modular wall as a permanent solution to the <br />problem. For obvious aesthetic reasons, applicant wishes to proceed with the timber wall <br />installation. <br />Review Exhibit I, the applicant's consultant has submitted an engineering report for a two -tiered <br />retaining wall ranging from 6-8' in total height. Gustafson asked for information on the structural <br />capacity of the proposed helix earth anchors to be used in the installation. He also asked that the <br />City be contacted at least 48 hours before the wall is installed. We recommend that applicant present <br />plans to the County Highway Department for their review as certain activities adjacent to County <br />right-of-way will be conducted within portions of the right-of-way. A permit will be required from <br />the County for all work done within the right-of-way of the County road. <br />The wall will be located within the lakeshore protected area approximately 69' from the 929.4. The <br />improvement will result in a hardcover increase of 90 s.f. or 15.6% within the 0-75' area. <br />Issues for Consideration <br />1. Since additional hardcover improvements are being proposed in the 0-75' setback area, <br />should additional hardcover improvements be either removed or reduced in the 75-250' <br />setback zone of the property (refer to Exhibit G)? <br />