Laserfiche WebLink
we would need easements from two or three property <br />ow.iprs. <br />C. C,.)nstruct an overflow at the outlet end o <br />culvert under Highwood Road approximate <br />$500.00. <br />D. Burming of properties most directly affected <br />the ponding <br />F. Restriction of flow at culvert on 19 <br />F. Installation of a manhole on the current line <br />together with an overflow at point shown on <br />Attachment G <br />G. Road drainage <br />1. raising to direct flowage <br />2. lowering to direct flowage <br />Issue 4. Process of Project <br />1. Direct the process be undertaken <br />2. Alter the process and adopt <br />3. Table <br />4. Undertake <br />Issue 5. Preliminary Financing <br />A. Do as a storm sewer assessment <br />B. Do as a storm water district <br />C. Tahle <br />D. Choose not to undertake <br />t''l c <br />cost <br />by <br />RECOMMENDATION - It is recommended that the Council conduct the <br />public hearing and continue that public hearing to the meeting of <br />May 25th at which time it is recommended that Council con ler <br />the issues of whether Council wants to undertake the projec he <br />means to undertake it, the process by which it is being don, and <br />the financing. <br />PROPOSED MOTION - Moved by , �-econded by , that the Council <br />following preliminary discussion and continuing the public <br />hearing defer further discussion to May 25, 1988 leaving the <br />record open and that Council undertake discussion of the balance <br />of the items related to this issue. Ayes __, Nays <br />4 <br />