My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-25-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
04-25-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/25/2025 12:59:10 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
4/25/1988
Retention Effective Date
8/25/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL PROVISIONS <br />1. PROJECT DESCRIPTION: This project provides for the grading, gravel base, <br />and bituminous surfacing on Woodhill Avenue. <br />2. OWNER: The City of Orono is designated as the Owner of the project. All <br />work shall be on public right-of-way or easements obtained by the Owner. <br />3. COMPLETION DATE: The contractor shall start work within 15 days afar <br />award of the contract and complete the project by July 15, 1988. <br />4. LIQUIDATED DAMAGES: Liquidated damages as specified in the General Condi- <br />tions of the Contract shall be One Hundred Dollars ($100.00) per calendar day. <br />5. SPECIFICATION REVISION: Where the Minnesota Department of transportation <br />specifications are referred to herein and where a reference to the word •State• <br />is mentioned, it is understood that the word •Owner' is substituted. All <br />reference to the word 'Engineer" shall be interpreted as the Engineer for the <br />City of Orono. Minnesota Department of Transportation Specifications for <br />Highway Construction, 1983 Edition and revisions thereto shall apply except as <br />noted herein. <br />6. TRAFFIC: Traffic control :;tu:ll be the responsibility of the Contractor. <br />All flagmen, barricades, flares and safety measures are the sole responsibil- <br />ity of the Contractor. Flares or approved flashers shall be required from <br />sunset to sunrise in the areas under construction. The contractor shall re- <br />view barricades and signing placement with the Engineer. Traffic control shall <br />be incidental to the construction. <br />7. SCALE: The Contractor shalt provide the necessary scale and scale person <br />for weighing the items furnished on a ton basis under these specifications. <br />The scale setup is subject to the approval of the engineer. The necessary <br />weights used in testing the scale shall be provided by the Contractor. <br />8. SOIL CONDITIONS: All Co:itrzctors are advised to inspect the entire project <br />area and verify soil conditions to their own satisfaction prior to submitting a <br />bid. <br />9. WATER: Where water is required in the work specified herein, it shall be <br />provided by the contractor. <br />No payment will be made for water placed on the project. It shall be con- <br />sidered incidental to the aggregate base construction. <br />10. UTILITIES: Known underground utilities are shown on the plans. It shall <br />be the responsibility of tine Cont--actor to check with all utility coo-:)anies to <br />determine the exact location:, of al.i utilities within the project area. <br />SP-1 <br />OR13934 <br />
The URL can be used to link to this page
Your browser does not support the video tag.