My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 1298
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 1200 - 1299 (September 15, 1980 - July 27, 1981)
>
Resolution 1298
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 1:57:30 PM
Creation date
11/12/2015 1:57:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> � Cit� of ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> • <br /> NO. �oZ"`/�_ <br /> • - � • <br /> 12. The waste management studies were completed in October, <br /> 1980 . Area #� was evaluated for the potential of per- <br /> manent on-site treatment facilities, for innovative <br /> treatment facilities, and for connection to the <br /> interceptor. <br /> 13. The limited lot sizes of the existing development in <br /> Area #2 coupled with the high water table assoeiated <br /> with the surrounding lake and wetlands made permanent <br /> on-site systems extremely costly and vulnerable to <br /> service failures. <br /> 14 . Municipal sewer connection was ordered for Area #2 as <br /> the most cost-effective, technically feasible alternative <br /> for management of the wastes generated by these existing <br /> homes. The per unit cost is a staggering $18 , 466 . <br /> On-site solutions would have been more costly. <br /> 15 . The MWCC and PCA approved municipal sewer systems in <br /> . Areas #2, 4 & 5 �n Map 12 in the fall of 1980. Both <br /> agencies had copies of Orono' s 1980 Community Management <br /> Plan on f.ile at the time they approved these c.onnections . <br /> Orono ' s 1980 CMP showed all three areas in the rural <br /> service area at the time this �ervice was approved. <br /> 16. The MWCC ' s letter approving sewer service for Areas #2, <br /> 4 & 5 from R.A. Odde dated January 12, 1981, includes <br /> a statement that "This project is in accord with your <br /> comprehensive sewer plan (CSP) and consistent with the <br /> Metropolitan Urban Service Area. " <br /> 17. The municipal sewer systems serving areas 2 , 4 & 5 <br /> empty into the Orono-Long Lake Interceptor via City <br /> Injector Stations approved by MWCC and installed <br /> consistent with the design intent of the interceptor, <br /> as documented in Orono ' s CSPP. <br /> 18. The municip�l sewer systems serving Areas #2, 4 & 5 <br /> have been completed and are in use as of this date . <br /> 19. After ordering the ps�ojects to serve Areas #2 , 4 & 5, <br /> City officials met with Karl Burandt of the MWCC on <br /> February 3, 1981, regarding review of Orono' s CMP: <br /> • <br /> 4 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.