Laserfiche WebLink
• <br /> l Cit� of ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> � NO. ��/C� <br /> • - • • <br /> c) 80 acres of Hennepin Park Reserve' s Noerenberg <br /> Memorial Gardens abut Area #2 to the west, permanently <br /> separating Area #2 from the nearest urban develo�inen.t. <br /> d) Directly east of Area #2 lay several hundred acr.es <br /> of undeveloped rural land, some with extensive Lake <br /> Minnetonka shoreZine. Designation of Area #2 as an <br /> urban island would be a probable prelude toward <br /> unplanned urb�nization of this land. <br /> 8 . No typically °'urban" services are available (except sewer} , <br /> including police, fire, public works, parks or transportation. <br /> None is planned. None are financially practical. <br /> 9. The Orono-Long Lake Interceptor was built abutting the pro- <br /> perties in Area #2 . Orono' s CSPP discusses the design and <br /> purpose of this interceptor beginning on page 6-23 . Page <br /> 6-45 relates this design to the 5 identified rural housing <br /> clusters . <br /> • 10 . The interceptor was specifically designed by MWCC and approved <br /> by Orono such that its route and capacity would accommodate <br /> future connection of those existir.g rural housing clusters <br /> identified for alternative waste manaaement studies . <br /> a) CSPP page 6-24 , last paragraph, discusses this <br /> design intention, specifically including capacity <br /> for "North Shore Drive" Area #2 . <br /> b) Note on page 6-24 that "There is no interceptor <br /> capacity designed to accommodate riew urban <br /> development in the existing rural areas of Or.or.o. <br /> This capacity (provided �or the existing rural <br /> clusters) is consistent with the land use plans of <br /> the other chapters of Orono ' s Community Management <br /> Plan. " <br /> c) The interceptor design specifically includes <br /> capacity �or 163 units from the identified rural <br /> housing clusters to be added via future Orono <br /> Injector Stations: Refer to the table and text <br /> on page 6-24 and to Ni�aCC Addendum No. 3 of the <br /> Orono-Long Lake Interceptor Preliminary Engineering <br /> Report, included in Orono' s CMP as pages 18-1 thru <br /> 18-14 , especially nage 18-10 . <br /> 11. At the time Orono' s Comprehensive Plan was completed in <br /> June, 1980, alternative waste management studies for ?�rea #2 <br /> • had not been completed. The rural designation for Area #� <br /> was unquestionably appropriate at this time. <br /> 3 c�f 12_ <br />