My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
04-11-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/19/2025 2:01:18 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
4/11/1988
Retention Effective Date
8/19/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2105. ROADWAY EXCAVATION <br />Specific Requirements <br />2105.0. SPECIFICATION REFERENCE: Section 2105 of the State of Minnesota De- <br />partment of Transportation, 'Standard Specifications for Highway Construc- <br />tion', 1983 Edition, and all amendments thereto, shall apply except as modi- <br />fied or altered in the following Specific Requirements. <br />2105.3. CONSTRUCTION REQUIREMENTS: All excavation and embankment <br />construction shall be to the line and grade as staked by the Engineer. <br />The excavated materiel shall be used to grade the boulevards as directed by <br />the Engineer. The boulevard areas shall be filled to a point three inches <br />belov the final grade as shown on the typical Rection. The boulevard area <br />shall be left level and free from rocks, clods and other debris. <br />The contractor shall provide topsoil borrov for the project. The topsoil <br />shall not be placed on the boulevard or ditch area until the fine grading <br />approved by the Engineer. The contractor will be required to grade the die <br />slopes as incidental to the topsoil borrow. <br />Excess material from the roadway excavation shall be disposed of along <br />Woodhill Drive as directed by the Engineer. The excavated material will be <br />used to grade and flatten ditch slopes between Station 3+00 and Station 6+00. <br />The contractor will be required to grade the disposal areas as directed by the <br />Engineer as incidental to the excavation. <br />2105.5. BASIS OF PAYMENT: Common excavation shall be paid for on a cubi- <br />yard basis as determined by cross section measure. Topsoil borrow shall be <br />paid for on a cubic yard basis (compacted volume) compacted in place. <br />OR1l931 <br />Copyright 198E <br />Donestroo, Posene. Anderlik <br />6 Associates, lnc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.