My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
04-11-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/19/2025 2:01:18 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
4/11/1988
Retention Effective Date
8/19/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11. TESTS: All material tests required in the specifications shall be paid <br />for by thN City of Orono. This does not eliminate the Contractor's responsi- <br />bility of assisting the Engineer by notification of pit and scale location end <br />other correlated items in advance of the starting time so that adequate con- <br />trol measures can be established. <br />Test failures shall be rete3ted at. the Contractor's expense. <br />12. DRIVEWAYS: driveway replaceme:t is required on Yoodhill Avenue as a part <br />of this project. Driveways shall be replaced to the existing surfacing as <br />directed by the Engineer. Bituminous driveway replacement shall consist of a <br />minimum of 3 inches of asphalt pavement and o inches of Class 5 gravel base. <br />Payment for bituminous driveways shall be on a ton basis. The Class 5 gravel <br />base shall be paid for on a ton basis. The con- tractor shall be required to <br />saw cut or jack ham:jer a square edge across the existing bituminous driveway. <br />Payment for 2341 bituminous material for drive- ways shall include bituminous <br />material for mixture, joint sawing, compaction and all other items incidental <br />to the complete driveway surfacing. <br />14. PROPE_RTI ACCESS: The Contractor shall provide access to each property <br />owner as much as practical during construction. The contractor shall work out <br />an acceptable schedule for access with the City Public Works Director. <br />15. GEOTEXTILY STABILIZATION FABRIC: A stabilization type geotextile fabric <br />shall be apiead over the su:,arade onrHoodhill Avenue prior to placing the <br />gravel base. <br />O113934 <br />
The URL can be used to link to this page
Your browser does not support the video tag.