My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
04-11-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/19/2025 2:01:18 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
4/11/1988
Retention Effective Date
8/19/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.4uesL11 b tdWCC, aLLeud scheduled meetings at the <br />project construct on site with MWCC's Construction Manage- <br />ment Group and Contractor's representatives to review <br />progress, schedules, accomplishments and problems. <br />Task 29 Provide inter.pt.:tation of drawings and specifications <br />during construction, respond to inquiries and provide other <br />supplementary engineering calculations and interpretations <br />of dr Brings and specifications. , II <br />Task 2h Prepare, review and recommend action for proposed change <br />orders. Prepare cost estimates for proposed change orders, <br />as requested. <br />Task 2i Assist MWCC's representatives in a final inspection of the <br />project for conformance with the requirements of the <br />contract documents. <br />Task 2j Assist MWCC's Construction Management Group in the sched- <br />uling, observation and approval of system checkout and <br />performance tests that will be conduc,=ed by the Contractor <br />and required by the contract specifications. <br />-_ATEGORY 3 - UPEPNTION MANUAL STARTUP SERVICES <br />'task 3a Prepare an Operation and htaintenance Manual. submit six <br />(b) copies of "draft" for review prior to 501 project <br />completion and submit ten (10) copies of "final" prior to <br />801 project completion. Final manual to incorporate MWCC <br />comments. <br />CATEGORY 4 - POST CONSTRUCTION SERVICES <br />Task 43 Provide final assembly of "as -recorded' documents. "As - <br />recorded" drawings to be based upon measurem„(,ts, sketches, <br />masked plans, notes, change orders, field modification <br />records and schedules provided by MWCC's Construction <br />Management Group. The Engineer shall submit the completed <br />"as -recorded" drawings within 90 days of the Engineer's <br />receipt of the necessary field modification data from the <br />MWCC Construction Management Group. <br />--2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.