Laserfiche WebLink
C. Noise - the <br />be minimal <br />and minimal <br />turbance of <br />1 8o Does any part of the project area Involve:1771 <br />a. shoreland zoning district? No Tres <br />b. delineated 100•year flood plain? No X Yes <br />c. slate or federally designated river land use district? No Yes <br />If yes, Identify water body and applicable state classlllca(lon(s), and describe measures <br />to protect water and related land resources: <br />a. Marina is in a lake classified by the 1.1N DNR as a General Recreation, <br />fully developed lake. <br />b. Dock use a, oach crosses flood plain, 929.4 to 931.5, to reach the lake. <br />'here '.s n9 s� it� fglopee3sto avlfldn, fill, stream diversion) of any <br />19. Descri a any t fiysica aft, <br />ota Ion e..., <br />drainage system, lake, stream, and/or wetland. Describe measures to minimize Im- <br />pairment of the water -related resources. Estimate quantity of material to be dredged <br />and Indicate where spoils will be deposited. <br />All measures will be taken during construction to keep the lake surface free of <br />debris and construction materials. No alterations or dredging of the lake <br />bottom is planned. Docks are of floating nature with poles to anchor docks <br />where necessary. <br />20. a.Wlll the project require an appropriation of ground or surface water? If yes, explain <br />(indicate quantity and source): <br />b.Wlll the project affect groundwater levels in any wells (on or oil the site)? If yes. ex- <br />plain: <br />1-21. Describe the erosion and sedimentation cont•ol measures to be used during and after <br />construction of the project. <br />None expected or regiired. <br />® <br />No <br />❑ <br />Yes <br />® <br />No <br />❑ <br />Yes <br />22. a. Will the project generate X No Yes <br />1. surface and stormwaler runoff? No Yes <br />2. sanitary wastewater) No Yes <br />3. Industrlal wastewaler? No Yes <br />4. cooling water (contact and noncontact►-) <br />If ves. Identify sources, volumes, quality (If other than normal domestic sewage), <br />and treatment methods. Give the basis or methodology of estimates. <br />b. Identify receiving waters, Including groundwater, and evaluate the Impacts of the <br />discharges listed above. If discharges to groundwater are anticipated. provide per* <br />colation/permeablllty and other hydrogeological test data. If available. <br />23. Will the prnjec' generate (ei(her during or alter construction) <br />a. aoi;,ttlo!t? <br />b dust? <br />c. noise? <br />d. odors? <br />If yes. explain. Including as appropriate distances to sensitive land uses: expected lev- <br />els and duration of noise: types and quantities of air pollutants from stacks. mobile <br />sources, and fugitive emissions Idusts: odur sources: and rniligative measures for any <br />Impacts. Give the basis or methedulugv ul estimates. <br />docks will be installed during the winter months. Noise will <br />as docks are preconstructed. Only anchor poles will be driven <br />hardware work performed. Project not expected to be a dis- <br />any conseq,tence. <br />No <br />Yes <br />No <br />N <br />Yes <br />5 <br />No <br />Yes <br />No <br />Yes <br />3 <br />