My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-1989 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1989
>
11-13-1989 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:01 AM
Creation date
8/4/2025 12:47:19 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
11/13/1989
Retention Effective Date
8/4/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. Reason for EAW preparation: Mandatory per 4410.4300 MEQB Review Provt , <br />List all mandatory category rule''s which apply: Subp. 25 <br />' $150,000 <br />. Estimated construction cost <br />8. Total project area (acres) <br />9 acres or length (miles) <br />9. Number of residential units n/a or commercial. Industrial. or Institutional square footage <br />10o Number of proposed parking spaces 68 spaces (includes existing space of 42) <br />11 • List all known local. state and federal permits/ approvals/ fuitding required: <br />Level of Government Type of Application Status <br />Federal: <br />State: DNR <br />Dock license amendment <br />Pending EAW approval <br />Local: LMCD Special Density & Dock licenses Approved <br />A City of Orono Building Permit Pending installation <br />1 2 e Is the proposed project Inconsistent with the local adopted comp ehensive land use <br />plan or any other adopted plans? IAI No ❑ 'fes <br />If yes, explain: <br />13. Describe current and recent past land use and development on and near the site. <br />Marina and marine related services — 40+ years <br />Property adjacent to the north is occupied b,7 Windward Marine, engaging in <br />retail boat sales, leasing of slips and mi 'ne repair on Tanager Lake and Brown's <br />Bay. :he property to the south is a chann. ,.1ro--ding access from Brown's Bay <br />to Tanager Lake. Residential property abutts the channel on the south side. <br />14 • Approximately how many acres of the site are In each of the following categories? <br />(Acreages should add up to total project area belere and after construction.) <br />Before After Before Alter <br />Forest/Wooded Wetland (types 3.8) <br />Cropland _ Impervious Surface <br />Brush/grassland Other (specify) _ • 9 --azres of water surface <br />15. Describe the soils on the site, giving the SCS soil classilicaiinn types, if known. <br />n/a <br />16. Does the site contain peat soils, highly erodible soils. steep slopes, sinkholes, shallow <br />limestone formations, abandoned wells. or any geologic hatards? If yes, show on site <br />Map and explain: <br />n/I <br />❑ No ❑ Yes <br />17. What is the approximate depth lin Ivvtt lip n/a 2 <br />OtuNHlltrtllMr ��ttlll:.,�a• y h hedrock rain -- - at q <br />
The URL can be used to link to this page
Your browser does not support the video tag.