Laserfiche WebLink
and ordering (6 months lead time) and installation of <br />equipment would probably not see completion until June, <br />1990. <br />^he proposed low bidder Keys Well and Drilling at $62,500 is <br />substantially under the $89,000 engineer estimate. Actual cost <br />will depend on which phases are needed. <br />ALTERNATIVES <br />1. Award to Key's Well makir, all but Phase 1 optional dependent <br />on needs. <br />2. Reject all bids. <br />3. Table pending resolution of interim production well cost <br />sharing and need. <br />RECOMMENDATION - It is recommended that the bid be awarded to <br />Keys Well as lowest responsible bidder with all but Phase #1 <br />being optional depending on need. (This recommendation may be <br />amended prior to zhe meeting.) <br />PROPOSED MOTION - Moved by _, seconded by _ , the Orono City <br />Council awards the bid for water well test drilling to Keys Well <br />for a bid of $62,590.00 with all but the initial. test drilling to <br />be optional depending on need. <br />cc: Glenn Cook, City Engineer <br />John Gerhardson, Public Works Director <br />