My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-1989 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1989
>
09-25-1989 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
7/29/2025 11:54:14 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
9/25/1989
Retention Effective Date
7/29/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9789.22 <br />14, <br />TO: Mayor and City Council <br />FROM: Mark E. Bernhardson, City Administrator <br />DATE: September 7, 1989 <br />SUBJECT: Well/Highway 12 <br />Attachment: A. Well/Highway 12 Memo Dated 8/10/89 <br />B. Bid Tabulation and Cover Letter <br />ISSUE <br />1. Decision as to whether the bid for the test wells should be <br />drilled on Highway 12. <br />2. If directed to be drilled, award of bid. <br />INTRODUCTION - In order to develop the well for the Highway 12 it <br />is necessary to undertake test drillings to determine an adequate <br />supply for a 500 gpm well. <br />DISCUSSION - The bid allows for r phases with Phase 5 to be bid <br />in October -November. <br />Phase #1 Test well/Site #1 (Otten) to the Prairio du Chien <br />aquifer. If adequate water is found no further tests <br />will be necessary and Phase 44. <br />Phase #2 Test well/Site #2 to Prairie du Chien. If Phase 1 isn't <br />sufficient r; test at Site 2 (Rebers rear lift station) <br />will be done. If adequate go to Phase #4. <br />Phase #3 Site #1/Test well to Mt. Simon/Hinckley aquifer. While <br />there is adequate water, the test will determine level <br />of radium. <br />Phase #4 Interim "Productior" well. If needed this will be <br />developed to provide water to the area until the Phase <br />#5 well is installed. This well (50 gpm) would be <br />eventually taken over by Cliff Otten. He would <br />contribute to its drilling. As alternatives a.) Cliff <br />Otten could individually drill a well which the City <br />could use and share costs on an interim basis or b.) The <br />City could tap an existing residential well presently <br />owned by Mr. Otten. <br />Phase #5 Municipal Well (500 gpm). This would include drilling a <br />12" well to the appropriate aquifer determined by the <br />test drillings. While this could be bid and possibly <br />drilled before winter, construction of the pump house <br />
The URL can be used to link to this page
Your browser does not support the video tag.