My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-1989 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1989
>
09-25-1989 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
7/29/2025 11:54:14 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
9/25/1989
Retention Effective Date
7/29/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
oao G. bore rE• fs tt+ A� .'V+x" c 4^AA rt n .o n cn.•.+► •[ <br />JVM R M.Wnd PA. M.Y► n wµl r! <br />`� Rpplys W. E04fR ►L. G ►E. Rc� / •-JVCf % C. rnorr,., a Mwtr:an n 9A <br />Bonest roo .eu�+ C. gnp�r►a P[ r Kran pacrM1 ►! Wry ► h+049 r[ <br />&.1VVA ^ Wfcvi /a Jerry A.X p wson !. MXV R � r[ Cry»s n El[ason <br />Min r I•.r1SOrl /a <br />Rosene R.tn>r0 ! T✓nee r[. ,� K. .cW. r4 R^�en C ,� AlA ur M N.snsY <br />;Jn7<f C. Curl /[ /e. TromiS i. MS+i rE <br />3 r+ R. Coon /E. +A ersn T. RJ�mJrrl <br />:Po <br />Anders i k & irp++s ! 1vCyts P! ReOeR R. Pfeffov. 0 s j Cf <br />Svc M Earn G <br />PA <br />wean a scrv,:re r ., or4 c �:>m. I. <br />Associates %4.",m L S*fv" ►f !ncrus W flleran rL. A "?I <br />Engineers & Architet*.s <br />August 10, 1989 - <br />i <br />City of Orono i <br />1335 Brown Road So - <br />Orono, MN 35323 <br />Res Water Well Test Drilling <br />Orono, M-4 <br />File No. 13948 <br />Dear Mayor and Council Members: <br />Enclosed are the contract documents for the test drilling to find a suitable <br />aquifer for a large capacity =nicipal well and the construction of a small <br />well for temporary use. The sequence of drilling and construction set forth <br />in the specifications is se follows. <br />I. Test Drilling <br />A. Drill a test hole at the primary site (Otten property) to determine if <br />sufficient Prairie -du -Chien is available for a large capacity well. <br />1. If there is sufficient aquifer available, a water analysis will <br />be taken and the test drilling completed. <br />2. If aquifer material is not available, a test hole will be drilled <br />on the secondary site (Rebers property). It is intended to drill <br />the secondary site prior to extending the test hole to the Mt. <br />Simon because a) the tit. Simon test hole is approximately $20,000 <br />mo,6e than a Prairie -du -Chien test hole and b) the secondary site <br />is closer to Long Lake's wells where the Prairie -du -Chien is <br />present. <br />B. If Prairie -du -Chien is not present at the secondary site a Mt. <br />Simon test hole will be drilled and a water sampli taken for <br />analysis including radium. <br />Page 2 <br />2335 West Hlchwav 36 • St. Paul. Minnesota 55113 • 612-636-4600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.