My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development Contract Orono Garage Condos LLC
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0430 Old Crystal Bay Road North - 33-118-23-13-0016
>
Resolutions
>
Development Contract Orono Garage Condos LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 12:02:13 PM
Creation date
6/30/2025 12:02:02 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Developers Agreements
Section
Contracts
Subject
Development Contract Garage Condos
Document Date
6/11/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Improvements shall be installed in accordance with the City subdivision ordinance; City <br />standard specifications for utilities and street construction; and any other ordinances including <br />those concerning erosion and drainage and any prohibiting grading, construction activity, and the <br />use of power equipment. The Developer shall submit plans and specifications which have been <br />prepared by a competent registered professional engineer to the City for approval by the City <br />Engineer. The Developer shall instruct its engineer to provide adequate field inspection <br />personnel to assure an acceptable level of quality control. In addition, the City may, at the City's <br />discretion and at the Developer's expense, have one or more City inspectors and a soil engineer <br />inspect the work as the City may reasonably determine. The Developer, its contractors and <br />subcontractors, shall follow all instructions received from the City's inspectors. The Developer's <br />engineer shall provide for on-site project management. The Developer's engineer is responsible <br />for design changes and contract administration between the Developer and the Developer's <br />contractor. The Developer or its engineer shall schedule a pre-construction meeting at a mutually <br />agreeable time at the City Council chambers with all parties concerned, including the City staff', <br />to review the program for the construction work. Within thirty (30) days after the completion of <br />the Improvements and before the "security" is released, the Developer shall supply the City with <br />a complete set of reproducible "as constructed" Plans, and an electronic file of the "as <br />constructed" Plans in an auto CAD file based upon the Hennepin County coordinate system, all <br />prepared in accordance with City standards. <br />9. IRON MONUMENTS. Not applicable. <br />10. PERMITS. The Developer shall obtain or require its contractors and subcontractors <br />to obtain all necessary permits, including but not limited to the following to the extent required: <br />MnDNR for Dewatering <br />235929v3
The URL can be used to link to this page
Your browser does not support the video tag.