City of Orono for Building Permits <br />MCWD for erosion control permit and storm water management permit <br />General Construction Permit(NPDES: National Pollutant Discharge Elimination <br />System) from MPCA <br />11. DEWATERING. Due to the variable nature of groundwater levels and <br />stormwater flows, it will be the Developer's and the Developer's contractors' and subcontractors' <br />responsibility to satisfy themselves with regard to the elevation of groundwater in the area and <br />the level of effort needed to perform dewatering and storm flow routing operations. All <br />dewatering shall be in accordance with all applicable county, state, and federal rules and <br />regulations. DNR regulations regarding appropriations permits shall also be strictly followed. <br />12. TIME OF PERFORMANCE. The Developer shall install all Improvements as <br />contemplated by Section 8 and the approved Plans by June 1, 2027. <br />13. LICENSE. The Developer hereby grants the City, its agents, employees, officers, <br />and contractors a license to enter the Land to perform all work and inspections deemed <br />appropriate by the City in conjunction with development of the Land. <br />14. EROSION CONTROL. Prior to initiating site grading, all required erosion <br />controls shall be implemented by the Developer and inspected and approved by the City. <br />Developer must adhere to Best Management Practices for Protecting Water Quality in Urban <br />Areas and to the approved SWPPP. The City may impose additional erosion control <br />requirements if reasonably required. All areas disturbed by excavation and backfilling operations <br />shall be reseeded within five (5) days after the completion of the work, weather permitting, or in <br />an area that is inactive for more than ten(10) days unless authorized and approved by the City <br />Engineer. Except as otherwise provided in the erosion control plan, seed shall be in accordance <br />235929v3