My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7586 Granting Final Plat Garage Condos CIC
Orono
>
Resolutions
>
2025
>
Resolution 7586 Granting Final Plat Garage Condos CIC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 11:33:13 AM
Creation date
6/30/2025 11:33:12 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Resolution
Section
Resolutions
Subject
Granting Final Plat Garage Condos CIC
Document Date
5/12/2025
Retention
Permanent After File Date
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-v..O.NO CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> G~ <br /> NO. 7586 <br /> �'k8SHO4� <br /> NOW, THEREFORE, BE IT RESOLVED, based upon the findings of Resolution <br /> No. 7579, the Orono City Council does hereby approve the plat of ORONO GARAGE <br /> CONDOMIMIUM CIC Plat for Phase 1: Buildings 1 and 2 (a copy of which is attached as <br /> Exhibit A), subject to the following conditions: <br /> 1) Development within ORONO GARAGE CONDOMIMIUM is subject to the Conclusions, <br /> Orders, and Conditions enumerated within Preliminary Plat, Conditional Use Permit and Site <br /> Plan approval Resolution No. 7579 dated April 28, 2025. <br /> 2) Dedication on the plat of the Ingress, Egress, Drainage and Utility Easements as required in <br /> Resolution 7579. <br /> 3) The approvals granted in this Resolution shall become effective only when all conditions of <br /> approval requiring actions by the Developer have been satisfied. <br /> 4) Minnehaha Creek Watershed District(MCWD)-approved permits for the grading, stormwater <br /> management facilities, storm water pollution prevention plan (SWPPP), and erosion control <br /> shall be submitted as required. <br /> 5) An updated Alta Commitment for Title Insurance dated April 16, 2025 and certified copies of <br /> all recorded easements currently affecting the Property have been submitted. <br /> 6) The Property is within the MUSA and will be served by the city's sanitary sewer and public <br /> water connections. <br /> 7) Payment of Development Fees Required (2025 fee schedule): Total: $47,384.10. <br /> a. Stormwater and Drainage Trunk Fee: $47,384.10. <br /> 8) Additional fees will be required with the appliable building permits for the site as follows: <br /> a. Water and Sewer Connection Permits: Connection permits will be required for each <br /> individual unit (85 units proposed) and will follow the applicable fee schedule for the year <br /> in which they connect. The individual permits and fees will be due at the time the <br /> connections are a installed to serve each unit. The fees will be collected with the building <br /> permit for the subject building. <br /> b. Met Council Sewer Availability Charge ("SAC"): Due to the size of the buildings and <br /> the number/type of proposed connections it is estimated that the development will <br /> require 14 SAC units in total according to the 2024 Met Council determination letters. <br /> The 2025 SACs have not increased. The SAC will be collected with each building permit. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.