My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7586 Granting Final Plat Garage Condos CIC
Orono
>
Resolutions
>
2025
>
Resolution 7586 Granting Final Plat Garage Condos CIC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 11:33:13 AM
Creation date
6/30/2025 11:33:12 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Resolution
Section
Resolutions
Subject
Granting Final Plat Garage Condos CIC
Document Date
5/12/2025
Retention
Permanent After File Date
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OHO CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> NO. 7586 <br /> IBIS SFL0 <br /> The current 2025 SAC is $2,485.00 per unit which would result in a total of$34,790.00 <br /> (or 14 x$2,485) required to connect all buildings in 2025. <br /> i. Building 1: 1 SAC Unit = $2,485 <br /> ii. Building 2: 3 SAC Units = $7,455 <br /> iii. Building 3: 4 SAC Units = $9,940 <br /> iv. Building 4: 4 SAC Units = $9,940 <br /> v. Building 5: 2 SAC Units = $4.970 <br /> c. Water and Sewer Connection Fee: The City of Orono does not have a per unit <br /> breakdown for industrial uses. Following Met Council's logic, the City finds it appropriate <br /> to apply the same SAC unit determination when applying the City's water and sewer <br /> area connection fees. <br /> The water and sewer area connection fees for each building will be collected with each <br /> building permit. Based on the City's official 2025 Fee Schedule, a $4,370.00 water unit <br /> connection fee and $6,000.00 per sewer unit will be applied (total $10,370.00 per unit) <br /> as follows: <br /> i) Building 1: 1 SAC Unit = $10,370.00 <br /> ii) Building 2: 3 SAC Units = $ 31,110.00 <br /> iii) Building 3: 4 SAC Units = $41,480.00 <br /> iv) Building 4: 4 SAC Units = $41,480.00 <br /> Building 5: 2 SAC Units = $ 20,740.00 <br /> All 5 buildings will result in 14 SAC units, totaling $145,180.00 (14 x$10,370.00) to connect <br /> to the City's water and sewer systems. <br /> 9. The City Clerk shall release the plat documents for filing only upon certification by the City <br /> Attorney, Community Development Director, and City Engineer that all requirements of the <br /> platting regulations have been satisfied. <br /> 10. Phased Development/Staging: Phase 1 will include construction of Building 1 and <br /> Building 2 as shown on Exhibit A. Approval of the Final Plat, recording of the development <br /> agreement, and easement must be completed before building permits are issued. Future <br /> Final Plat approval will be required when Phase 2, Buildings 3-5 are ready to be <br /> constructed. <br /> 11. Upon substantial completion of Buildings 1 and 2, executed Mylars must be submitted to the <br /> City for recording for Phase 1 Final Plat. The City will not conduct the final building <br /> inspection or issue occupancy certificates for the buildings until the Mylars are recorded. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.