My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-2025 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
2025
>
05-27-2025 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:56:59 AM
Creation date
6/6/2025 2:33:24 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
5/27/2025
Retention Effective Date
5/27/2025
Retention
Permanent After File Date
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QBOLTON <br />& MENK <br />Real People. Real Solutions. <br />January 7, 2025 <br />City of Orono <br />Attn: Adam Edwards <br />PO Box 66 <br />Orono, MN 55323 <br />RE: Hackberry Park Revitalization- Design Services <br />Dear Adam: <br />2638 Shadow Lane <br />Suite 200 <br />Chaska, MN 55318-1172 <br />Ph: (9521 448-8838 <br />Fax: (9521 448-8805 <br />Balton-Menk.com <br />As requested, we have prepared a scope of services and fee estimate to develop plans and specifications <br />for improvements to Hackberry Park. <br />Proposed Scope of Services <br />To assist the city with this improvement project, Bolton & Menk proposes the following scope of <br />services: <br />Project Management.............................................................................................. $19,000 <br />The tasks associated with Project Management will include: <br />• Kick-off meeting (1 total): in -person meeting with desired city representation and Bolton & <br />Menk, Inc. staff to confirm project scope, timeline, and deliverables; Bolton & Menk to prepare <br />meeting agenda and compile notes summarizing discussion. <br />• Coordination meetings (up to 5): Ongoing progress updates and design coordination <br />• Utility coordination meeting (1 total) <br />• Watershed coordination meeting (up to 2) <br />• Shelter/Restroom design coordination: Coordination with prefabricated building manufacturer <br />to finalize structure design to be included in construction plan set. Coordination of site design <br />and utility requirements. <br />Survey........................................................................................................................ $8,500 <br />Survey work to include the following items: <br />• Capture topographic survey for the entire Hackberry Park and existing right-of-way. Survey <br />work to include extents necessary to tie into the existing pavement at Willow Drive. <br />• It is anticipated that this project will leverage existing topographic mapping and new <br />coordinates and elevations collected through this effort. <br />Permitting Assistance................................................................................................ $7,000 <br />Bolton & Menk will work with city staff to identify and complete the necessary permits. <br />• Wetland delineation & report. <br />• City plumbing and building permits <br />• Department of Public Health <br />Boltun & Menk Is an equal opportunity employer <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.