My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-2025 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
2025
>
05-27-2025 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:56:59 AM
Creation date
6/6/2025 2:33:24 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
5/27/2025
Retention Effective Date
5/27/2025
Retention
Permanent After File Date
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
term improvements through a process including staff, parks commission and public engagements. <br />c. County Road 6 Trail Resurfacing. <br />The scope of work for this project is to resurface portions of the asphalt trail. <br />4. Cost: <br />a. Hackberry Park Design. Bolton and Menk has provided a not to exceed proposal of $87,200. <br />b. Antoine Park Master Plan. Bolton and Menk has provided a not to exceed proposal of <br />$10,600. <br />c. County Road 6 Trail Pavement Improvement. Bolton and Menk provided a not to exceed <br />proposal of $6,980. <br />Funding: <br />These project are funded by the Parks fund. All were included in the Parks CIP for 2025. <br />The Hackberry Park project, once it reaches the construction phase, will also require funding from <br />the Stormwater Fund, Pavement Fund and grants. <br />6. Staff Recommendation: <br />I recommend moving forward with these park efforts. <br />COUNCIL ACTION REQUESTED <br />Move to direct staff to commence work on the 2025 Parks projects: Hackberry Park Design, Antoine <br />Park Master Plan and CR6 Trail Resurfacing. Further to accept the proposals from Bolton and Menk for <br />the same. <br />Exhibits <br />A. Fee Estimate - 2025 Hackberry Park Design <br />B. 24-028 Hackberry Park Revitalization CIP Sheet <br />C. 2024-08-06 Hackberry Park Executive Summary <br />D. Fee Estimate - 2025 Antoine Park Master Plan <br />E. 25-032 Antoine Park CIP sheet <br />F. Fee Estimate - CR 6 Trail Improvements <br />G. 25-043 CR6 Trail Resurface CIP Sheet <br />►y: <br />
The URL can be used to link to this page
Your browser does not support the video tag.