Laserfiche WebLink
0 <br />0 <br />3 <br />D <br />n <br />a <br />a <br />0 <br />a <br />a <br />a <br />a <br />a <br />a <br />a <br />a <br />a <br />The Medina system consists of two drift wells (200 gpm and 100 gpm) and a <br />pressure tank. There would not be adequate fire protection under this option <br />and the City would have to plan to construct a water tower some time in the <br />future. The City would still want an agreement with Long lake for fire <br />protection until a new tower is constructed. <br />The third option would be to construct a new well and pressure system <br />(500 GPM) fy serve the Orono area. There would not be adequate fire protec­ <br />tion under this option either and the City would have to plan for a future <br />water tower. The agreement with Long lake for fire protection would also be <br />necessary. This option would provide the City with the greatest independence. <br />The water main for options two and three would connect to the Orono <br />system near T.H. 12 and Willow Drive. The water main would extend north aloi . <br />Willow Drive to the proposed frontage road. The water main would then be <br />extended east to the Rebers subdivision. The water main would not be looped <br />down to T.H. 12 to connect to the Long Lake system. The Rebers subdivision <br />would connect to the system at two locations for looping purposes. We would <br />propose to make a detailed study for the well and tower at such time as the <br />City decides what option to follow. <br />- 7 - <br />013939R <br />Q