Laserfiche WebLink
I <br />I <br />a <br />a <br />a <br />a <br />a <br />a <br />n <br />0 <br />Q <br />PROJECT COSTAND FUNDING <br />The project cost and funding alternatives are outlined in this section <br />with a detailed cost es*-iv *■« provided in the appendix. The indicated project <br />costs are as projected i-r tne 1989 construction season (ENR 4510). <br />I, SANITARY SEWER <br />A. Project Cost <br />Pipe J & K (Lateral) <br />Pipe J 6 K (Trunk) <br />TOTAL <br />$158,450.00 <br />138,650.00 <br />$297,100.00 <br />Pipe B-2. C. D, C, Trunk (2)$518,150.00 * <br />* Total Replacement > This would not be a part of the current project <br />Partial replacement would be $160,750 less. <br />B. Assessment Rates <br />Lateral Sewer Rate 158,450 f 179 ■ $890.00/unit <br />The lateral sewer is determined to benefit 179 units (69 - Rebers; <br />10 - Otten; 100 - others) <br />Trunk 5 wer Rate <br />Trunk Rate (1) - 138,600 t 329 $ 420.00/unit <br />Trunk Rate (2) - 518,150 f 379 $1,370.00/unit <br />There are two trunk rates - the first rate does not include Medina <br />units and 150 other units (50 - Medina; 69 - Rebers; 10 - Otten; <br />250 - Others) <br />- 8 - <br />013939R