My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-24-1989 Council Packet
Orono
>
City Council
>
1989
>
04-24-1989 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 9:22:41 AM
Creation date
4/7/2025 2:21:33 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
572
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a <br />3 <br />3 <br />ri <br />lJ <br />Li <br />3 <br />3 <br />3 <br />3 <br />is not willing to allow additional connections, the City of Orono has two <br />options for serving the area. The City of Orono can begin an independent <br />water systea or the Rebers and Otten Subdivions can be served with private <br />wells. <br />The impleoentation of a City of Orono water system can begin with the <br />construction of a well and pressure system. The City could also extend a line <br />along Willow Drive to connect to the City of Medina sytem in Medina Morning- <br />side. The construction of a water tower could take place as additional units <br />are developed between Willow Drive and Old Crystal Bay Road. <br />The first option choice would be to connect the water main to the Long <br />Lake system. The water main connection would occur at two locations (T.H. 12 <br />and Willow Drive, T.H. 12 and Shaughnessy) to provide a looped system. The <br />water main would be extended north on Willow Drive to the proposed frontage <br />road. Then east along the proposed frontage road to the Rebers property and <br />then south to T.H. 12. The proposed water main would be 8 inch DIP with <br />hydrants placed along the line for fire protection. The Rebers subdivision <br />would connect to the main at two locations to provide a looped system within <br />the subdivision. <br />The second option would be to connect the water main to the Medina System <br />at Medina Momingside. The main would be extended north along Willow Drive to <br />Momingside Road in Medina. This proposed extension would require cooperation <br />between the City of Medina and the City of Orono. <br />3 <br />3 <br />3 <br />- 6 - <br />013939R
The URL can be used to link to this page
Your browser does not support the video tag.