Laserfiche WebLink
B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />S <br />B <br />B <br />B <br />B <br />B <br />B <br />DISCUSSION <br />This proposed project will consist of the construction of water main and <br />sanitary sever to serve the Rebers and Otten Subdivision. The utilities will <br />be extended along the alignment of future streets on the property. The sani­ <br />tary sever line will be extended as a lateral line to provide service to the <br />adjacent property. The water line will also be extended to provide lateral <br />service. <br />The proposed sanitary sever project would connect to the existing <br />sanitary sever system at T.H. 12 vest of Villov Drive. The T.H. 12 Trunk <br />Sanitary Sewer Report indicated that adequate capacity is not available for <br />all future development proposed in the T.H. 12 Corridor Study. It is proposed <br />that this project proceed; with the plan to expand the downstream system as <br />demand requires. It will be necessary to provide adequate funding for the <br />future system by developing a trunk sewer fund. <br />The proposed sanitary sewer line would be extended north across T.H. 12 <br />from the existing system to the location of a future street alignment. The <br />sever line would be extended east along the street alignment to Willow Drive. <br />The sever line would then be extended to the east line of the Otten property. <br />The Rebens property would be served by a lift station to be constructed near <br />T.H. 12 and Shaughnessy. The lift station would be pumped back to the gravity <br />line through a six inch force main. <br />The water main will be extended from the existing system provided <br />approval can be obtained from the City of Long Lake. If the City of Long Lake <br />- 5 - <br />013939R