My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-24-1989 Council Packet
Orono
>
City Council
>
1989
>
04-24-1989 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 9:22:41 AM
Creation date
4/7/2025 2:21:33 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
572
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Q <br />0 <br />D <br />a <br />D <br />0 <br />a <br />a <br />n <br />PROJECT COST <br />The project cost and assessment rates for the storm sever improvement are <br />outlined in this section with a detailed cost estimate provided in the <br />appendix. The indicated prices are as projected for the 1989 construction <br />season (ENR 4510). <br />Project Cost <br />Assessment Area <br />Assessment Rate <br />$ 30.250.o0 <br />7.1 Acres <br />$ 0.10/Sq.ft. <br />The project costs are proposed to be assessed to the benefiting property <br />ovi.ers in the drainage area on a square foot basis. The estimated cost for a <br />typical 135' by 50' lot in the area is $675.00. <br />The estimates do not include costs for temporary or permanent easements <br />necessary to construct the proposed storm sever system. <br />3 <br />3 <br />3 <br />3 <br />3 <br />- 4 - <br />RPT13946
The URL can be used to link to this page
Your browser does not support the video tag.