My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-17-2025 - Agenda Packet Planning Commission - PC Packet
Orono
>
Planning Commission
>
2025
>
03-17-2025 - Agenda Packet Planning Commission - PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:21 AM
Creation date
3/18/2025 9:25:39 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Planning Commission
Section
Planning Commission
Subject
PC Packet
Document Date
3/17/2025
Retention
After
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(11) Not create a nuisance which generates smoke, noise, glare, vibration, odors, fumes, dust, <br />electrical interference, general unsightliness, or other means; The applicant states the activity <br />resulting from the Garage Condos will not cause a nuisance, smoke, noise, glare, vibration, <br />odors, fumes, dust, electrical interference, or general unsightliness. <br />(12) Not cause excessive non-residential traffic on residential streets, parking needs that cause a <br />demonstrable inconvenience to adjoining properties, traffic congestion, or unsafe access;The <br />adjoining properties should not experience parking issues or traffic congestion. The proposed <br />use is expected to have significantly less traffic than the generally allowed uses in the <br />Industrial zoning district. <br />(13) Designed to take into account the natural, scenic, and historic features of the area and to <br />minimize environmental impact; The site is being designed to enhance the natural <br />environment with the stormwater management and planting plans. The site was originally <br />graded when the industrial district was platted in 2007 (Crystal Bay Business Center) and has <br />been vacant with no native plantings or natural areas. <br />(14) All exterior lighting shall be so directed so as not to cast glare toward or onto the public right- <br />of-way or neighboring residential uses or districts; and The site is being designed to not cast <br />glare toward public right-of-way or neighboring residential uses or districts. <br />(15) Not detrimental to the public health, public safety, or general welfare. The proposed use is <br />not detrimental to the public health, public safety, or general welfare and is expected to have <br />less of a chance of any negative impact than the generally allowed uses within the Industrial <br />zoning district. <br />(16) Economic return.The use will provide an economic return to the community and be <br />commensurate with other industrial uses for which the property could feasibly be used. In <br />considering the economic return to the city, the planning commission and city council may <br />give weight to the sociological impact of proposed use, both positive and negative. The <br />applicant noted the use is consistent with the industrial district and other surrounding uses. <br />The site is screened and buffered from abutting residential districts. The use of the property <br />will be interior to the buildings with little exterior activity thus limiting negative impacts to the <br />surrounding area. <br />Fees: <br />The submitted plans reflected each individual building provided with individual connections for City <br />sewer and water with each unit being metered individually. A Sewer Availability Charge (“SAC”) <br />determination by the Metropolitan Council (Met Council) is required in order to calculate the <br />appropriate fees for sewer services. Staff is recommending to use the Met Council’s unit determination <br />to calculate the City’s water and sewer area connection charge. The applicant is requesting these fees <br />be due at time of building permit for each building. Typically, these fees are due at time of final plat, <br />because this is an industrial development and proposed as a phase project staff can accommodate <br />applying these fees with the building permit. <br />At this time, due to the size of the buildings and the number/type of proposed connections it is <br />estimated that the development will require 14 SAC units according to the Met Council. Therefore, City <br />will calculate the water and sewer area charges for 14 units. Each individual condo or suite will need its <br />own water meter. A utility connection permit will be due at the time of building permit issuance for <br />109
The URL can be used to link to this page
Your browser does not support the video tag.