Laserfiche WebLink
each unit that will be metered as well. <br />PROPOSED DEVELOPMENT FEE ANALYSIS: <br />Fee Type Breakdown Estimated Total <br />Water Area Connection $4,370.00 x 14 units $61,180.00 <br />Water Connection Permit Fee $150.00 x 85 suites**$12,750.00 + meter costs <br />Sewer Area Connection $6,000.00 x 14 units $84,000.00 <br />Sewer Connection Permit Fee $150.00 x 85 Suites**$12.750.00 + meter costs <br />Sewer Availability Charge “SAC” <br />(Met Council) <br />$2,485.00 x 14 units*$34,790.00* <br />Stormwater Drainage Trunk Fee $9,690.00 x 4.89 acres $47,384.10 <br />ESTIMATED DEVELOPMENT FEES = $ 252,854.10 <br />*A SAC determination is required by the Met Council and may alter this fee. <br />110