Laserfiche WebLink
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO.7488 <br />Rural Residential District (2.0 acres) and LR-lA Single Family Lakeshore Residential <br />District (2.0). <br />4. The proposed plat would create one new buildable lot. Lot 1, Block 2 is 21.62 acres in <br />area and 370 feet at the OHWL. Lot 1, Block 1 is 15 acres in area and a width of 890 feet. <br />Lot 2. Block 1 is 14.48 acres in area and a width of 660 feet. The three newly created lots <br />are conforming to their zoning districts as it relates to area and lot width. <br />The Property to the south of Bayside Road lies within 1,000' of Lake Minnetonka requiring <br />conformance with the hardcover regulations of the Stormwater Quality Overlay District. <br />The entire Property is within Hardcover Tier 1 allowing 25% impervious surface. The <br />Properties to the north of Bayside Road are exempt from hardcover regulations. <br />6. No additional variances have been requested. The development of the vacant lots will be <br />required to meet all zoning standards. <br />CONCLUSIONS, ORDER AND CONDITIONS <br />NOW, THEREFORE, BE IT RESOLVED, that based upon one or more of the <br />findings noted above, the City Council of the City of Orono hereby grants Preliminary Plat Approval <br />for a 3-lot subdivision per the Preliminary Plat survey/drawing by Mark S. Gronberg of Gronberg & <br />Associates, Inc. dated June 28, 2024 and attached hereto as Exhibit B, subject to the following <br />conditions: <br />1) Lot Standards. Any proposed improvements must meet all setbacks requirements of the <br />Zoning Code. <br />2) Septic and Private WeII. The Properties are not located within the Metropolitan Urban <br />Service Area (MUSA) and therefore will be served by private septic systems. The properties <br />will also be served by individual private water supply wells. <br />3) Stormwater and Drainage Improvements. Final plat approval is subject to Minnehaha <br />Creek Watershed District (MCWD) approval and permits as required. Final plat approval shall <br />not be granted until the Developer has provided evidence that all required MCWD permits <br />have been obtained. Upon building permit issuance, the property owner will be required to <br />comply with individual lot stonnwater and erosion control management practices. <br />4) Drainage and Utility Easements. On the final plat, Drainage and Utility Easements shall be <br />dedicated to the public 10' along all exterior property lines, and 5' either side of interior property <br />lines, except such easements shall be increased to accommodate drainage where required, <br />75 <br />