My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-25-1990 Council Packet
Orono
>
City Council
>
1990
>
06-25-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 12:21:35 PM
Creation date
11/12/2024 12:14:11 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Q2: Show th« potential exits and entrances for Maple Plain <br />to the potential corridors, <br />A2: Again, these will be determined through the process and <br />have not been defined at this time. <br />Q3: What would be the fate of the prior Highway corridor? <br />A3: It would be turned back to county or local jurisdiction. <br />Q4: Would the City be assured of adequate signage and ease <br />of exit and entrance to the Highway? <br />A4: Yes. <br />05: Since there is likely to be heated controversy to the <br />east in Orono, how would that affect Maple Plain? Would the <br />entire corridor be placed with input only from those cities <br />that take an official stand? <br />A5: The segment of T.H. 12 in the Iiong Lake/Orono area will <br />be the most difficult to upgrade. The routes which are <br />considered may have some impact in Maple Plain. A mechanism <br />is already in place to allow for input from all of the <br />communities along the Highway 12 corridor.
The URL can be used to link to this page
Your browser does not support the video tag.