My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-26-1990 Countil Packet
Orono
>
City Council
>
1990
>
03-26-1990 Countil Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2024 2:17:06 PM
Creation date
10/14/2024 2:15:38 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Some residents have indicated that they feel the installation costs of this project will not be reflected totally in the future sale price of their homes, this is typical of many types of home improvements, such as room additions or remodeling. However, as one of the resid^nf. indicated at the last meeting, the City sewer makes your h'^me much more marketable. Additionally, there are some properties, and perhaps yours is one of them, that would <br />have to revert to a holding tank system if your septic system <br />fails. This would in the long run be more expensive than <br />installation of city sewer. <br />While the installation of city sewer represents a permanent <br />solution to the problems experienced in the Stubbs Bay area, as <br />is the case in other areas, the neighborhood is going to have to <br />make the decision whether they want sewer or not. <br />The City will make continued efforts to make the project more <br />economically viable through design, and address individual <br />considerations to protect properti as much as possible. Should <br />you have questions please feel to call Michael Gaffron, John <br />Gerhardson or myself. <br />Sincerely, <br />Mark E. Bernhardson <br />City Administrator <br />MEB/dh <br />Enclosures
The URL can be used to link to this page
Your browser does not support the video tag.