My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-08-11 Mechanical Specifications
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1535 Bohns Point Road - PID: 08-117-23-44-0025 - New PID
>
1535 Bohns Point Rd - PID: 08-117-23-44-0023 - Old PID
>
Permits (2)
>
1986-08-11 Mechanical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2024 2:02:05 PM
Creation date
8/28/2024 1:59:22 PM
Metadata
Fields
Template:
x Address Old
House Number
1535
Street Name
Bohns Point
Street Type
Road
Address
1535 Bohns Point Road
PIN
0811723440023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ft <br />. ' <br />I •. <br />3.05 <br />A. <br />B. <br />C. <br />0. <br />F. <br />G. <br />3.07 <br />A. <br />B. <br />C. <br />D. <br />othvrvise. Housekeeping pads* four (4) inches thick* of <br />140 pcf dense concrete* shall be furnished for all mechan <br />ical equipnent located on floor slabs. <br />IDENTIFICATION <br />All piping installed under this contract shall be identified <br />every 50 feet* both sides of all or floor penetration and <br />at every change of direction of flow by stenciling black <br />letters on yellow background. Direction of flow shall be <br />indicated by a black arrov; on the yellov; background. Letters <br />shall be a minimum height of 1". <br />After the piping systems have been completed and pressure <br />tested* set all hand valves and control valves in an open <br />position. <br />Fill the systems with clean water and start the system pumps. <br />Using the chemical feeders on the hydronic and chilled water <br />systems* add dosage as recommended by chemical support per <br />gallon of water in system. <br />E. After the cleaner has been added to the systems* continue <br />to run the pumps for a period of four hours. During this <br />period* the pump strainers shall <br />as required to prevent damage to the pumps* but in no case shall inspection and cleaning be done at g <br />be inspected and cleaned <br />s* but in no casi greater than one <br />hour intervals. <br />At the end of the four hour run* drain all systems com- <br />pletly* then flush with clean water for a two hour period <br />discharging dirty water to sewer. Systems shall be flushed <br />forward and reverse flows. <br />Drain systems* remove* clean and replace all strainer screens <br />and fill system with clean water. <br />PIPE SLEEVES <br />Provide sleeves for all pipes that pass through walls* slabs* <br />concrete columns or concrete bridging, provide sleeves whether <br />specifically indicated or not. <br />Provide sleeves passing throuh concrete walls* slabs* beams* <br />bridging* columns* which are 1/2" greater in inside diameter <br />than .external diameter of insulated pie passing through <br />sleeves. Pipe insulation shall be continuous through the <br />sleeves. <br />Fabricate all steel pipe sleeves of new material* cut square* <br />reamed. <br />At sleeves through walls* extend full thickness of wall* <br />cut flush with finished surfaces. <br />15050-6 <br />i <br />1
The URL can be used to link to this page
Your browser does not support the video tag.