My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-08-11 Mechanical Specifications
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1535 Bohns Point Road - PID: 08-117-23-44-0025 - New PID
>
1535 Bohns Point Rd - PID: 08-117-23-44-0023 - Old PID
>
Permits (2)
>
1986-08-11 Mechanical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2024 2:02:05 PM
Creation date
8/28/2024 1:59:22 PM
Metadata
Fields
Template:
x Address Old
House Number
1535
Street Name
Bohns Point
Street Type
Road
Address
1535 Bohns Point Road
PIN
0811723440023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-• <br />t <br />M <br />n <br />. <br />Mi <br />•n <br />( <br />t ■». <br />I ! <br />1.05 <br />A. <br />B. <br />1.06 <br />A. <br />B. <br />C. <br />JOB CONDITIONS <br />Prior to start of testing, adjusting and balancing, verify <br />that required job conditions are met. ^ <br />Remove or valve off from the system, gauges, traps and other <br />apparatus which may be damaged by the test pressure. <br />TESTS <br />Well Water* Water piping shall be tested hydrostatically <br />at 125 pslg for a period of two hours prior to application <br />of pipe Insulation and final connection to fixtures. <br />Motors: Test under load conditions with flow rates, suction <br />and discharge pressures. RPM and motor amperage and voltage <br />recorded. <br />Gas Piping System: Piping shall be tested with air at 50 <br />pslg for a period of two hours. Soap test all joints. Use^ <br />clean dry air for testing. The systems which may be contamln <br />ated by gas shall be purged before testing. <br />D. Automatic Temperature Control <br />All temperature control systems shall be checked out <br />under operating conditions with the actual operations <br />verified and temperature reading around each control <br />point to prove the correct control function or operation <br />All damper functions shall be similarly verified. These <br />facts shall also be included with the certificates. <br />E. Automatic Temperature Control (Electrical) <br />1.Test the systems to maintain the required conditions. <br />The system must perform the functions Indicated while <br />operating in the sequences specified. <br />F. Ventilation Tests <br />1. <br />2. <br />Terminal Devices: Upon completion of the work and prior <br />to final inspection, all ventilating equipment shall <br />be placed in operation and adjustments made as necessary <br />in fan speeds and damper settings to provide air quanti <br />ties shall be provided. Velocity readings taken at all <br />supply, return, exhaust and fresh air grilles, registers, <br />Ipuvers and hoods with alnor, anemotherm or equal instru <br />ment as approved by the Owner/Engineer. Not less than <br />four readings shall be taken at each device and the cor <br />responding air volume computed. Submit copy of test <br />results to the Owner/Engineer for review. <br />Fans and Motors: Test under load conditions with static <br />pressures at fan Inlet and outlet, fan RPM and motor <br />amperage and voltage recorded. <br />15020-2 <br />5 d <br />•t
The URL can be used to link to this page
Your browser does not support the video tag.