My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-08-11 Mechanical Specifications
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1535 Bohns Point Road - PID: 08-117-23-44-0025 - New PID
>
1535 Bohns Point Rd - PID: 08-117-23-44-0023 - Old PID
>
Permits (2)
>
1986-08-11 Mechanical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2024 2:02:05 PM
Creation date
8/28/2024 1:59:22 PM
Metadata
Fields
Template:
x Address Old
House Number
1535
Street Name
Bohns Point
Street Type
Road
Address
1535 Bohns Point Road
PIN
0811723440023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
View images
View plain text
•Wil <br />wm <br />\ * <br />E ' <br />! <br />SECTION 15020 <br />TESTING. ADJUSTING AND BALANCING <br />PART 1 - GENERAL <br />1.01 <br />A. <br />B. <br />A. <br />1.03 <br />A. <br />B. <br />C. <br />D. <br />E. <br />1.04 <br />A. <br />SCOPE <br />Section 15010 Mechanical General Requirements and all gen <br />eral and supplementary conditions of this project manual <br />apply to all work under this section. <br />Employ and pay for a qualified organization to perform sped <br />fied services. The Balance Contractor shall he certified <br />by Associated Air Balance Council or National Environmental <br />Balancing Bureau (NEBB). <br />1.02 RELATED WORK <br />Related work is specified under other Sections of this sped <br />fication and shall become a cart of this Section. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />Section <br />Section <br />Section <br />Section <br />Section <br />Section <br />15012 <br />15350 <br />15*U0 <br />15780 <br />15840 <br />15900 <br />Mechanical and Electrical Coordination <br />Gas Piping System <br />Water Supply System <br />Air Systems Equipment <br />Ductwork and Accessories <br />Temperature Control <br />DESCRIPTION OF WORK <br />Perform testing on well water system, gas piping system, <br />temperature control, ventilation system and all motors. <br />Tests shall be made in presence of proper inspectors and <br />the Owner or their duly authorized representative. <br />All work shall be inspected, tested and approved as required <br />by the State, local and designated representative of the <br />Owner. <br />Tests shall be reported until each system is proven acceptable. <br />All tests of piping systems, except final tests of completed <br />systems shall be made before pipe is covered or connected <br />to fixtures and equipment. <br />All gauges, tools, pumps, gas, air or other equipment required <br />for testing and initial adjusting of piping systems shall <br />be purchased and provided by this Contractor. <br />SUBMITTALS <br />Submit three copies of test certificates to the Owner for <br />approval. <br />15020- I <br />a
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).