Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
•Wil <br />wm <br />\ * <br />E ' <br />! <br />SECTION 15020 <br />TESTING. ADJUSTING AND BALANCING <br />PART 1 - GENERAL <br />1.01 <br />A. <br />B. <br />A. <br />1.03 <br />A. <br />B. <br />C. <br />D. <br />E. <br />1.04 <br />A. <br />SCOPE <br />Section 15010 Mechanical General Requirements and all gen­ <br />eral and supplementary conditions of this project manual <br />apply to all work under this section. <br />Employ and pay for a qualified organization to perform sped <br />fied services. The Balance Contractor shall he certified <br />by Associated Air Balance Council or National Environmental <br />Balancing Bureau (NEBB). <br />1.02 RELATED WORK <br />Related work is specified under other Sections of this sped <br />fication and shall become a cart of this Section. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />Section <br />Section <br />Section <br />Section <br />Section <br />Section <br />15012 <br />15350 <br />15*U0 <br />15780 <br />15840 <br />15900 <br />Mechanical and Electrical Coordination <br />Gas Piping System <br />Water Supply System <br />Air Systems Equipment <br />Ductwork and Accessories <br />Temperature Control <br />DESCRIPTION OF WORK <br />Perform testing on well water system, gas piping system, <br />temperature control, ventilation system and all motors. <br />Tests shall be made in presence of proper inspectors and <br />the Owner or their duly authorized representative. <br />All work shall be inspected, tested and approved as required <br />by the State, local and designated representative of the <br />Owner. <br />Tests shall be reported until each system is proven acceptable. <br />All tests of piping systems, except final tests of completed <br />systems shall be made before pipe is covered or connected <br />to fixtures and equipment. <br />All gauges, tools, pumps, gas, air or other equipment required <br />for testing and initial adjusting of piping systems shall <br />be purchased and provided by this Contractor. <br />SUBMITTALS <br />Submit three copies of test certificates to the Owner for <br />approval. <br />15020- I <br />a