Laserfiche WebLink
11 <br />1 <br />J <br />I . -V <br />I-'' <br />■ 9^. <br />* j <br />J <br />F • • M <br />r'^.' <br />•; <br />B. <br />PART 2 - PRODUCTS <br />Not used. <br />PAR"^ 3 - EXECUTION <br />3.01 OPERATIONAL TESTS <br />A. The Contractor shall be responsible for starting up the equip­ <br />ment . <br />Prior to starting* clean all equipment* adjust belts to proper <br />tension and install air filters. Ensure existence of covers <br />and guards on moving parts. <br />Adjust safety and operating controls as necessary to place <br />them in proper operation and sequence. <br />During the tests, test equipment under every condition of <br />operation* test all safety controls and combustion controls; <br />periodically clean the various strainers until no further <br />accumulation of foreign matter occurs. <br />Exercise care to ensure minimum loss of refrigerant* steam, <br />water or gas* etc. <br />3.02 INSTRUCTIONS TO OPERATING PERSONNEL <br />A. Provide two mandays of instruction to designated personnel. <br />Some equipment may need more than two days of instructions. <br />This requirements shall be field determined. <br />END OF SECTION <br />C. <br />D. <br />U <br />4^ • <br />1 <br />F- <br />15020-3