My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-08-11 Mechanical Specifications
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1535 Bohns Point Road - PID: 08-117-23-44-0025 - New PID
>
1535 Bohns Point Rd - PID: 08-117-23-44-0023 - Old PID
>
Permits (2)
>
1986-08-11 Mechanical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2024 2:02:05 PM
Creation date
8/28/2024 1:59:22 PM
Metadata
Fields
Template:
x Address Old
House Number
1535
Street Name
Bohns Point
Street Type
Road
Address
1535 Bohns Point Road
PIN
0811723440023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
''/N.-Trr <br />n <br />«4 <br />> OMt <br />••4 <br />1 ' <br />I - <br />SECTION 15015 <br />DISINFECTION OF WELL WATER LINES <br />PART 1 - GENERAL <br />1.01 SCOPE <br />A.Section 15010 Mechanical General Requirements and all general <br />and supplementary conditions of this project manual apply <br />to all work under this section. <br />B.Provide personnel, equipment and supplies to disinfect nev <br />well water systems installed under this contract and flush <br />out systems at completion of treatment. <br />1.02 RELATED WORK <br />A. Related work is specified under other sections of this speci <br />fications and shall become a part of this section. <br />1. Section 150 0 <br />2. Section 1505' <br />3. Section 15410 <br />Testing, Adjusting and Balancing <br />Basic Materials and Methods <br />Well Water System <br />1.03 SUBMITTALS <br />A. A Certificate of Performance shall be submitted to the Owner <br />that d:*sinfection procedures and performance has been pro <br />vided in accordance with the State Board of Health. <br />PART 2 - PRODUCTS <br />2.01 MATERIALS <br />A. Disinfectant <br />1. Free chlorine; liquid, power, tablet or gas. <br />PART 3 - EXECUTION <br />3.01 STERILIZATION <br />A.Upon completion of cold and hot water piping systems, in <br />cluding water service connections, this Contractor shall <br />steri.lize these systems with chlorine before they are placed <br />in operation. Amount of chlorine applied shall be such as <br />to provide a dosage of not less than 50 parts per million. <br />Following a contact period of not less than 24 hours, the <br />chlorinated water shall be flushed from the system with clean <br />water until the residual chlorine content is not greater <br />than 0.2 parts per million. All valves in water lines being <br />sterilized shall be opened and closed several times during <br />the 24 hour period. <br />END OF SECTION <br />15015-1
The URL can be used to link to this page
Your browser does not support the video tag.