Laserfiche WebLink
♦ * <br />SECTION 15012 <br />mechanical and electrical coordination <br />PART 1 - general <br />] <br />1.01 <br />A. <br />B. <br />C. <br />E. <br />F. <br />SCOPE <br />Section 15010 Mechanical General Requirements and all general <br />and supplementary conditions of this project manual apply <br />to all worn under this section. <br />Mechanical and Electrical Contractors shall respectively <br />coordinate their work between the various trades to insure <br />proper installation and operation of all systems. <br />All equipment installation shall be in accordance to the <br />manufacturer's recommendations and applicable codes. <br />Clearances for servicing the equipment shall be maintained. <br />Additional offsets of piping, conduit and other equipment <br />b6 r6cjuir6d to mdintsin sorvic© cl©©r^nc6» <br />Submittal and approved shop drawings shall be obtained before <br />the ordering and installation of equipment. <br />The following list is presented to assist the Mechanical <br />Contractor with coordination and shall not be considered <br />as inclusive for all coordination required. <br />1. Air supply systems. <br />2. Pool room air handler. <br />3. Exhaust fans and PRVS. j j e, <br />4. Flue vent dampers, combustion air dampers and humidifiers. <br />5. Temperature control damper set. <br />6. Diffusers, registers and grilles. <br />7. Louvers ancj air reliefs. <br />Also included in this work are connections including shut­ <br />off valves, backflow preventers, reducing valves, unions, <br />double check valve assembly, open wastes and traps to make <br />up supply water to miscellaneous equipment room connections <br />and drains from overflow and units. <br />PART 2 - PRODUCTS <br />Not used. <br />PART 3 - EXECUTION <br />G. <br />Not used. <br />END OF SECTION <br />15012-1