Laserfiche WebLink
Part D; South Frontage Road <br />Alternate 1 - From Old Crystal Bay Road to Willow Drive. <br />Estimate I - Minnesota Department of Transportation Participation <br />Item Unit Unit Price Est. Quant.Est. Cost <br />Coounon Excavation C.Y.$3.00 7,000 $ 21,000.00 <br />Class 3 Aggregate base C.Y.6.00 3,800 22.800.00 <br />Class 5 Aggregate base Ton 6.00 4,800 28.800.00 <br />2331 Bituminous base course Ton 14.00 1,740 24,360.00 <br />2341 Bituminous wear course Ton 16.00 870 13,920.00 <br />AC-1 Bituminous material for <br />mixture Ton 150.00 160 24.000.00 <br />Bituminous material for tack <br />coat Gals.2.00 600 1.200.00 <br />Restoration Acre 4 ,000.00 0.75 3.000.00 <br />Estimated Construction Costs $139,080.00 <br />lOZ Contingency 13.910.00 <br />Total Estimated Construction $152,990.00 <br />181 Legal.Engr., Admin.27.540.00 <br />Total $180,530.00 <br />5Z Bonding St Capitalized Interest 9.070.00 <br />TOTAL PROJECT COST . . .$189,600.00 <br />APP13951 <br />- 8 -