Laserfiche WebLink
p„t C, North Frohfge Bo.d fro. Bri.h.11 A... E«. to Bro™ Bo.d. <br />Estimate II - City of Orono <br />Item <br />Common Excavation <br />Class 3 Aggregate base <br />Class 5 Aggregate base <br />2331 Bituminous base course <br />2341 Bituminous wear course <br />AC-1 Bituminous material for <br />mixture <br />Bituminous material for tack <br />coat <br />B618 Concrete curb i gutter <br />15* RCP culvert <br />18* RCP culvert <br />24* RCP culvert <br />24* RCP apron w/trash guard <br />Standard catch basin <br />Standard catch basin manhole <br />Rip rap w/geotextile fabric <br />Mechanical trench compaction <br />Restoration <br />Unit <br />C.Y. <br />Unit Price Est. Quant.Est. Cost <br />$ 3.00 2,000 $ 6,000.00 <br />C.Y.6.00 350 2,100.00 <br />Ton 6.00 450 2,700.00 <br />Ton 14.00 32 448.00 <br />Ton 16.00 16 256.00 <br />Ton 150.00 3 450.00 <br />Gals.2.00 100 200.00 <br />L.F.6.00 3,100 18.600.00 <br />L.F.22.00 250 5,500.00 <br />L.F.24.00 300 7,200.00 <br />L.F.30.00 300 9,000.00 <br />Each 800.00 1 800.00 <br />Each 700.00 2 1,400.00 <br />Each 1,000.00 4 4,000.00 <br />C.Y.100.00 8 800.00 <br />L.F.1.00 900 900.00 <br />Acre 4,000.00 1.0 4.000.00 <br />Estimated Construction Costs <br />lOZ Contingency <br />Total Estimated Construction <br />18Z Legal, Engr., Admin. <br />Total <br />5Z Bonding i Capitalized Interest <br />TOTAL PROJECT COST . . . . . . . . . <br />$ 64.354.00 <br />6.436.00 <br />$ 70,790.00 <br />12.740.00 <br />$ 83,530.00 <br />4,170.00 <br />$ 87,700.00 <br />- 7 - <br />II <br />APP13951