Laserfiche WebLink
Part Dt South Frontage Road <br />Alternate 1: From Old Crystal Bay Road to Villow Drive. <br />Estimate II - City of Orono <br />Item <br />Common Excavation <br />Class 3 Aggregate base <br />Class 5 Aggregate base <br />2331 Bituminous base course <br />2341 Bituminous wear course <br />AC-1 Bituminous material for <br />mixture <br />Bituminous material for tack <br />coat <br />B618 Concrete curb & gutter <br />15* RCP culvert <br />18* RCP culvert <br />48" RCP culvert <br />48" RCP apron v/trash guard <br />Standard catch basin <br />Standard catch basin manhole <br />6' di. catch basin manhole <br />Rip rap w/geotextile fabric <br />Mechanical trench compaction <br />Restoration <br />Unit <br />C.Y. <br />C.Y. <br />Ton <br />Ton <br />Ton <br />Ton <br />Gals. <br />L.F. <br />L.F. <br />L.F. <br />L.F. <br />Each <br />Each <br />Each <br />Each <br />C.Y. <br />L.F. <br />Acre <br />Estimated Construction Costs <br />102 Contingency <br />Total Estimated Construction <br />182 Legal, Engr., Admin. <br />Total <br />52 Bonding & Capitalized Interest <br />TOTAL PROJECT COST . . . . . . . . . <br />Unit Price Est. Quant.Est. Cost <br />$ 3.00 3,000 $ 9,000.00 <br />6.00 600 3,600.00 <br />6.00 800 4,800.00 <br />14.00 54 756.00 <br />16.00 27 432.00 <br />150.00 5 750.00 <br />2.00 100 200.00 <br />6.00 5,400 32,400.00 <br />22.00 1,100 24,200.00 <br />24.00 500 12,000.00 <br />70.00 100 7,000.00 <br />2.000.00 2 4,000.00 <br />700.00 5 3,500.00 <br />1.000.00 2 2,000.00 <br />2,000.00 2 4,000.00 <br />100.00 24 2,400.00 <br />1.00 1.700 1,700.00 <br />4.000.00 2.0 8.000.00 <br />$120,738.00 <br />12.072.00 <br />$132,810.00 <br />23.910.00 <br />$156,720.00 <br />7.880.00 <br />$164,600.00 <br />APP13951 <br />- 9