Laserfiche WebLink
♦ « <br />S.P. 2713-75 (TH 12) <br />PAGE I <br />POSSIBLE STAGING 9-2-98 <br />RDR <br />YEAR I SI 9,500.000 <br />PERMANENT CLOSURE - MAY ST AND WATERTOWN RD <br />TEMPORARY CLOSURE - WILLOW DR <br />I. MOVE LIFT STATION NEAR FLEMING POND <br />2. CONSTRUCT SOUTHERN RETAINING WALLS <br />3.RAILROAD GRADING. EXCLUDING: <br />- RAILROAD CONNECTIONS TO INPLACE RAILROAD <br />• BROWN RD <br />- OLD CRYSTAL BAY RD <br />4. CONSTRUCT SOUTH FRONTAGE RD <br />5. CONSTRUCT TEMPORARY WILLOW DR AND BRIDGE <br />6. RECONSTRUCT LUCE LINE BRIDGES AT NEW 12 AND INPLACE 12 <br />7. BEGIN CONSTRUCTION OF BROWN RD AND BRIDGE <br />8. CONSTRUCT PROPOSED PARK AND RIDE LOT AND RELOCATED LONG LAKE CITY HALL <br />YEAR 2 $7,000,000 <br />TEMPORARY CLOSURE - OLD CRYSTAL BAY RD, BROWN RD, AND LAKE ST <br />1. RAILROAD GRADING AT OLD CRYSTAL BAY RD AND BROWN RD <br />2. RAILROAD TRACK CONSTRUCTION, EXCLUDING WEST AND EAST RAILROAD CONNECTIONS <br />3. railroad GRAOrNG AND TRACK. CONSTRUCTION AT WEST AND EAST RAILROAD CONNECTIONS <br />4. MOVE RAILROAD <br />5. CONSTRUCT TEMPORARY RAILROAD CROSSING EAST OF BROWN RD <br />6. RECONSTRUCT IN PLACE 12 AT BROWN RD <br />7. COMPLETE CONSTRUCTION OF BROWN RD AND BRIDGE