Laserfiche WebLink
r <br />i <br />i <br />S.P. 2713-75 (TH 12) <br />PAGE 2 <br />POSSIBLE STAGING <br />4 • * <br />9-2-98 <br />RDR <br />YEAR 2 (CONT) <br />8. RECONSTRUCT OLD CRYSTAL BAY RD AND BRIDGE <br />9. CONSTRUCT CONNECTION FROM LAKE ST TO DANIELS ST <br />RE-OPEN OLD CRYSTAL BAY RD, BROWN RD. AND LAKE ST <br />REMOVE TEMPORARY RAILROAD CROSSING <br />YEAR 3 $2I.000,ooa <br />I <br />TEMPORARY CLOSURE - WILLOW DR <br />I. CONSTRUCT NORTHERN RETAINING WALLS <br />2. CONSTRUCT NEW 12, EXCLUDING CONNECTIONS TO INP 12 <br />3. RECONSTRUCT WILLOW DR AND BRIDGE <br />4. CONSTRUCTION ALONG INP 12 - MAY ST TO GLENMOOR LN <br />5. CONSTRUCT BRIDGE FROM EB INP 12 TO EB NEW 12 IN WAYZATA <br />6. CONSTRUCT ROADWAY FROM INP 12 TO NEW CO RD 6 IN ORONO <br />7. CONSTRUCT RAMP AND LOOP FOR NEW INTERCHANGE IN ORONO <br />8. RECONSTRUCT CO RD 6 <br />REOPEN WILLOW DR <br />YEAR 4 $6.500,( <br />1. COMPLETE CONSTRUCTION OF WEST CONNECTION AND CO RD 6 <br />2. CONSTRUCT EAST CONNECTION AND WAYZATA BLVD <br />3. CONSTRUCT PEDESTRIAN BRIDGE IN LONG LAKE <br />4. MISCELLANEOUS <br />TOTAL S54.000.000